# How to estimate kitchen refurbishment for a UK job Plan the scope, check quantities and review an itemised kitchen refurbishment estimate in pounds with a matching UK example PDF. Canonical: https://quicklyestimates.com/en-gb/guides/how-to-estimate-kitchen-remodel/ Author: Estimates editorial team Published: 2026-09-25 Updated: 2026-09-25 Use a measured keep-layout kitchen update example to separate the scope, quantities, product allowances and labour, then review the £7,962.58 illustrative PDF before making your own estimate. THE SHORT ANSWER Estimate a kitchen refurbishment by defining the layout first, then separating cabinets, worktops, appliances, utility work and finishes. Identify selections that remain allowances and the measurements or supplier quotes needed before the final price. Use this fictional keep-layout kitchen update in Leeds to plan the estimate. The agreed work is: Update a kitchen while retaining the existing layout. Remove cabinets and worktops, install 5.5 metres of stock cabinets, allow for 3.3 sq m of worktop, reconnect existing sink services, replace splashback and paint affected walls. Appliances supplied by the customer. The matching kitchen refurbishment example and PDF (https://quicklyestimates.com/en-gb/samples/kitchen-remodel-estimate/) shows the same inputs. These quantities and rates are teaching examples; use your own site measurements, product selections, supplier information and labour figures for a customer job. 1. Use a selection schedule List cabinet style, worktop type, sink, tap and appliances with a selection status beside each. Mark an item as selected, customer-supplied or allowance. The estimate should make unfinished decisions visible rather than treating every choice as settled. 2. Give cabinets a measurable basis A linear-foot cabinet allowance can help explain an early example, but real cabinet pricing also depends on the unit schedule, drawers, end panels and accessories. Reconcile the allowance against the supplier’s actual list before presenting it as a final product price. 3. Keep appliance responsibilities explicit Customer-supplied does not automatically include unloading, moving, installation or disposal of old appliances. State which of those tasks is included. Confirm that dimensions and connection requirements are available before committing to the installation scope. 4. Identify dependencies before scheduling Worktop measurements, cabinet delivery and splashback completion depend on earlier steps. Include a plain-language assumption about product availability and access. Do not use the estimate to promise a completion date that has not been checked against those dependencies. Calculate the measured lines The PDF uses 8 separate items. For example, Stock cabinet material allowance is 5.5 metres × £472.40 = £2,598.20; Cabinet installation is 5.5 metres × £223.10 = £1,227.05. Check that each unit describes the work being priced: area for a surface, metres for a run, and a count or defined lump sum for a discrete task. A material purchase allowance can differ from the installed quantity when product sizes, cuts or layout require it. Adding the 8 rounded line amounts gives £7,962.58 . The example PDF uses a 0% tax input and no markup; those settings do not determine how to price or treat an actual job. Do not copy the rates as a local price guide. Check the scope before sending - Reconcile cabinet quantities with a supplier list. - Identify sink cutouts, end panels and hardware. - Assign appliance delivery and installation responsibilities. - Separate layout changes from the keep-layout base scope. Outside the base scope: No wall removal, structural alterations, utility relocation or appliance purchase. Worktop and cabinet selections remain example allowances. Confirm the site address, selected products, access, quantities, customer details and validity date. If opening the work reveals a different condition, record the change and update the relevant line before asking the customer to approve the revised work. Preview every page of the PDF so the written scope, line amounts and total tell the same story. Common questions Can I quote a kitchen before all selections are final? You can prepare an estimate with clearly labelled allowances. Explain which selections may change the total and replace the allowances with confirmed supplier quotes before treating them as fixed prices. Should cabinets and worktops be one line? Separate them when they have different suppliers, quantities or selection assumptions. It makes scope changes and customer comparisons easier to understand. (https://quicklyestimates.com/en-gb/samples/kitchen-remodel-estimate/) Preview of the matching estimate PDF · View the matching example (https://quicklyestimates.com/en-gb/samples/kitchen-remodel-estimate/) FROM SITE NOTES TO AN ITEMISED PDF Make your own kitchen refurbishment estimate. Enter the scope in Estimates on iPhone or Android, edit each quantity and rate in pounds, add your business and customer details, and review the PDF before sharing it. Create an estimate ↗ (https://quicklyestimates.com/en-gb/download/)Explore the kitchen refurbishment PDF example → (https://quicklyestimates.com/en-gb/samples/kitchen-remodel-estimate/) Get the app: https://quicklyestimates.com/en-gb/download/ App Store (iPhone): https://apps.apple.com/app/id6740389403 Google Play (Android): https://play.google.com/store/apps/details?id=com.uzel.contractorplus