THE ESTIMATING ANSWER
For one accessible brick wall, start with a defined scope and measurement basis. Measure net wall area, openings, mortar defects and access height before assigning coating quantities. Confirm the specified breathable coating and mock-up location with the owner; product choice is not interchangeable. Price the listed tasks separately and state the condition that would require a revision: Trapped moisture, active movement or unsound mortar requires review before coating.
This guide follows one accessible brick wall in Bunbury, Western Australia. The matching itemised estimate and PDF show how the job brief becomes measured quantities and separate AUD amounts. The responsible role in this scenario is painter. Check the actual site, selected products, supplier figures and labour plan before issuing a client quote.
1. Define the measured job
Prepare and coat one sound exterior brick elevation after documenting its condition and the selected coating system. Measure net wall area, openings, mortar defects and access height before assigning coating quantities. Record the measurements and existing condition in the estimate before turning quantities into line items. The scope should make clear why this is a separate project from a broader renovation or maintenance quote.
Measure for this job: Measure net wall area, openings, mortar defects and access height before assigning coating quantities. Put that measured basis beside the relevant PDF lines so area, fitted length and product purchase quantities stay distinct.
2. Build a product and labour schedule
Confirm the specified breathable coating and mock-up location with the owner; product choice is not interchangeable. This example has 7 distinct lines, including wall inspection and trial area, masking and protection, brick cleaning. Use actual supplier prices and labour inputs for a customer job; the displayed amounts are fictional document inputs.
Choose before pricing: Confirm the specified breathable coating and mock-up location with the owner; product choice is not interchangeable. The fixture separates wall inspection and trial area, masking and protection and brick cleaning rather than hiding all work in one figure.
3. Sequence the work and handoffs
Check substrate condition, clean, dry, trial a small area and only then coat the wall. Show which task depends on access, a selected product or another trade. If that dependency is still open, label the price preliminary and identify the information needed before a firm quote.
Plan the handoffs: Check substrate condition, clean, dry, trial a small area and only then coat the wall. Note which stage needs access, a selected product or another trade before the next stage can be priced confidently.
4. Set a change boundary
Trapped moisture, active movement or unsound mortar requires review before coating. The example excludes damp remediation, repointing or removal of existing impermeable coatings. Record the discovery, agree the revised work and update the estimate before adding it to the job.
Change trigger: Trapped moisture, active movement or unsound mortar requires review before coating. Record the revised task and quantity before it changes the amount your client sees.
Review the Australian job
Inspect the existing surface, access, product schedule and handoff conditions. Resolve unknown work and confirm any specialist requirements before giving a client a final quote.
The brick cleaning line uses 39.02 m². Keep the site measurement and supplier's selling unit together; a material purchase allowance can differ from installed coverage. The amounts are fictional AUD inputs, not current prices for Bunbury, Western Australia or another location.
Worked project calculation
The paired PDF has 7 cost lines. For example, Brick cleaning is 39.02 m² × A$31.00 = A$1,209.62; Local surface preparation is 8 hours × A$83.81 = A$670.48. Each amount comes from the stated quantity and unit rate, so you can trace the arithmetic back to the job scope.
| Work item | Quantity | Unit rate | Amount |
|---|---|---|---|
| Wall inspection and trial area | 1 job | A$339.58 | A$339.58 |
| Masking and protection | 1 job | A$260.10 | A$260.10 |
| Brick cleaning | 39.02 m² | A$31.00 | A$1,209.62 |
| Local surface preparation | 8 hours | A$83.81 | A$670.48 |
| Primer allowance | 1 job | A$346.80 | A$346.80 |
| Finish coating material allowance | 1 job | A$520.20 | A$520.20 |
| Coating application | 39.02 m² | A$62.00 | A$2,419.24 |
| Illustrative total | A$5,766.02 | ||
Adding every exact-cent line gives A$5,766.02. The PDF uses a 0% tax input only to make its fictional arithmetic visible. Confirm the GST treatment that applies to the actual job and set your own markup before sharing a client quote. A fictional rate is a document input, not a market quote or a recommended selling price.
Scope and pricing boundaries
Prepare and coat one sound exterior brick elevation after documenting its condition and the selected coating system.
Outside this example: No damp remediation, repointing or removal of existing impermeable coatings.
Separate product allowances, supply, installation, disposal and any specialist work where the actual project needs them. If access or a hidden condition changes, document the affected scope and agree a revised price instead of silently extending the base amount.
Before you send the estimate
- Measure net wall area, openings, mortar defects and access height before assigning coating quantities.
- Confirm the specified breathable coating and mock-up location with the owner; product choice is not interchangeable.
- Check substrate condition, clean, dry, trial a small area and only then coat the wall.
- Trapped moisture, active movement or unsound mortar requires review before coating.
Check business and client details, address, dates, scope, units, line amounts and PDF notes. The exterior brick painting PDF example shows how this fictional project is presented. Its short PDF note is not a substitute for the detailed exclusions above.
Questions about this estimate
Which quantity controls this exterior brick painting estimate?
Measure net wall area, openings, mortar defects and access height before assigning coating quantities.
When should this exterior brick painting quote be revised?
Trapped moisture, active movement or unsound mortar requires review before coating. No damp remediation, repointing or removal of existing impermeable coatings.