EXAMPLE AT A GLANCE
This fictional kitchen benchtop replacement quote for Canberra, Australian Capital Territory has 7 itemised lines totalling A$7,390.80. Review the exact metric quantities and scope, then open the matching app-exported PDF. The 0% tax entry is only an example input.
The 3.9 m² kitchen counter replacement scope
Remove an existing benchtop and install 3.9 m² of selected replacement counter on suitable retained cabinets. Include a separate 3.66 m edge allowance, one sink cutout, template visit, installation and disposal. Sink and tap are owner-supplied; plumbing reconnection is excluded.
This is an original fictional job set in Canberra, Australian Capital Territory. The location gives the example a recognisable setting; the rates are made-up inputs and do not describe local prices. Use the matching estimating guide to check what should be measured, selected or excluded on a real job.
- Prepared by
- Harbour & Gum Projects · fictional business
- Prepared for
- Alex Morgan · fictional customer
- Example location
- Canberra, Australian Capital Territory
- Issued / valid through
- 25 September 2026 / 25 October 2026
Itemised kitchen benchtop replacement example
Each amount is its quantity multiplied by its AUD unit rate, rounded to cents. These 7 entries match the fixture used to make the PDF. Metric surface and length units describe the priced work, not a conversion rule for another property.
| Work item | Quantity | Unit rate | Amount |
|---|---|---|---|
| Existing top removal | 5.49 m | A$161.00 | A$883.89 |
| Template and field measurement | 1 job | A$280.00 | A$280.00 |
| Benchtop material allowance | 3.9 m² | A$1,054.90 | A$4,114.11 |
| Edge treatment allowance | 3.66 m | A$82.50 | A$301.95 |
| Sink cutout allowance | 1 each | A$266.00 | A$266.00 |
| Benchtop fitting and installation | 3.9 m² | A$331.50 | A$1,292.85 |
| Disposal and cleanup | 1 job | A$252.00 | A$252.00 |
| Subtotal / example total | A$7,390.80 | ||
Calculation check: 5.49 m × A$161.00 = A$883.89; 3.9 m² × A$1,054.90 = A$4,114.11. The demonstration tax field is 0%, so the displayed total stays A$7,390.80. Determine tax and markup for your own work instead of using this input as guidance.
Assumptions and scope boundaries
Finished edges, sink cutouts and special corners can be separate supplier charges. Count them explicitly rather than implying that measured area includes every detail.
Outside this example: No cabinet repair, sink or tap purchase, plumbing reconnection, splashback replacement or specialty structural support.
Selections, access or concealed conditions that differ from this scope require a revised quantity, allowance or separate line. The example deliberately separates them so the client can see what has and has not been priced.
Open the app-exported PDF
The PDF is a completed example exported from Estimates using this job data, fictional parties and the line amounts above. Read all pages to check notes as well as the total. The preview is the first page.
Adapt this example to your next job
- Replace the example location and project description with the actual site and client's requested result.
- Measure the work in the units shown, revising each quantity and product allowance to suit your plans and site inspection.
- Obtain your own supplier and labour inputs, then check access, protection, disposal and any specialist trade boundaries.
- Record exclusions and choices that remain open; review markup and tax for the actual quote.
- Preview every page of the PDF and check the item totals before sharing it.
- Verify runs, depths and template requirements.
- Select material and finished edges.
- Count sink and fixture openings.
- Assign plumbing and splashback work.
Common questions about kitchen benchtop replacement
Is a sink cutout part of the square-metre price?
It may be a separate fabrication task. Show it explicitly when it has its own supplier or labour cost.
Can I finalize the price before templating?
Use a labelled allowance or preliminary quantity, then reconcile it to the fabricator measurement and selected details.
FROM SCOPE TO PDF
Make your own kitchen benchtop replacement estimate.
Describe the actual job in Estimates on iPhone or Android, then review every quantity, rate and scope note. Add your business and client details, check the document and share an itemised PDF. Example amounts are fictional, and some app features may require an in-app purchase.