EXAMPLE AT A GLANCE
This fictional Launceston, Tasmania outdoor tap installation example contains 7 itemised costs totalling A$1,835.80. Its app-exported PDF uses the exact metric quantities and AUD rates in the table, with scope assumptions and exclusions explained below.
Project scope: One new exterior tap point
Add one outdoor cold-water tap at a confirmed suitable exterior wall near an accessible internal supply.
This original fictional example is set in Launceston, Tasmania. Harbour & Gum Projects and Alex Morgan are made-up parties. The matching Australian guide explains which measurements, product decisions and site conditions turn this brief into a client-ready quote.
- Example location
- Launceston, Tasmania
- Prepared by
- Harbour & Gum Projects · fictional business
- Prepared for
- Alex Morgan · fictional customer
- Issued / valid through
- 25 September 2026 / 25 October 2026
Itemised outdoor tap installation costs
These 7 AUD lines reproduce the native app export. Tap and backplate allowance is measured as 1 each; Pipe routing labour uses 5 hours. Some lines are measured work while others are a product or site-task allowance. Read the unit before reusing the structure for a different job.
| Work item | Quantity | Unit rate | Amount |
|---|---|---|---|
| Route and supply survey | 1 job | A$194.30 | A$194.30 |
| Wall penetration protection | 1 job | A$180.90 | A$180.90 |
| Tap and backplate allowance | 1 each | A$221.10 | A$221.10 |
| Isolation and pipe allowance | 1 job | A$281.40 | A$281.40 |
| Pipe routing labour | 5 hours | A$120.60 | A$603.00 |
| Connection and test | 1 job | A$241.20 | A$241.20 |
| Seal and cleanup | 1 job | A$113.90 | A$113.90 |
| Illustrative total | A$1,835.80 | ||
Product selection and installation should be clear from the descriptions. Confirm delivery, fixings, preparation, waste and any specialist trade responsibility for the actual job rather than assuming each allowance covers them.
Check the arithmetic
Tap and backplate allowance: 1 each × A$221.10 = A$221.10. Pipe routing labour: 5 hours × A$120.60 = A$603.00. All other lines use the same quantity-by-rate calculation and sum to A$1,835.80. Every fixture line lands on an exact cent, so the native PDF subtotal equals the displayed table total.
Measurement to check: Measure pipe route, wall construction, shutoff access and drain-down or freeze protection needs. Selection to check: Separate tap assembly, isolation valve and pipe material allowances. The PDF uses a 0% tax input only to make its fictional arithmetic visible. Confirm the GST treatment that applies to the actual job and set your own markup before sharing a client quote.
Assumptions and exclusions
Identify a suitable supply connection before drilling or routing pipe.
Outside this stated scope: No garden irrigation system, long trench or internal wall rebuild.
Hidden services or an unsuitable supply location can change the route. A changed condition should lead to a newly measured quantity, revised allowance or separately agreed task. Keep the client informed of the changed figure before producing another PDF.
Open the app-exported PDF
The document was exported from Estimates using the fictional business, client, dates, short PDF scope, notes and cost lines shown here. The image is the first-page preview. Open the complete PDF to check all entries; no rate is a current Launceston, Tasmania market claim.
Adapt this example to a real job
- Write the actual work boundary and site address; use this measurement basis: Measure pipe route, wall construction, shutoff access and drain-down or freeze protection needs.
- Confirm products, access and handoff responsibilities; record this selection decision: Separate tap assembly, isolation valve and pipe material allowances.
- Replace all fictional product, labour and subcontractor rates with your own evidence.
- Review quantities, extensions, total, GST and markup settings, client details and validity date.
- Preview every PDF page and share the quote with the agreed exclusions.
- Measure pipe route, wall construction, shutoff access and drain-down or freeze protection needs.
- Separate tap assembly, isolation valve and pipe material allowances.
- Identify a suitable supply connection before drilling or routing pipe.
- Hidden services or an unsuitable supply location can change the route.
Read the paired estimating guide for the project-specific scope and work sequence.
Questions about this estimate
Which quantity controls this outdoor water tap installation estimate?
Measure pipe route, wall construction, shutoff access and drain-down or freeze protection needs.
When should this outdoor water tap installation quote be revised?
Hidden services or an unsuitable supply location can change the route. No garden irrigation system, long trench or internal wall rebuild.
TURN THE SCOPE INTO AN ITEMISED PDF
Make your own outdoor tap installation estimate.
Describe the actual job in Estimates on iPhone or Android or use AI assistance to start a draft. Check every measurement, quantity, rate, allowance, client detail and note before exporting your PDF. Some app features may require an in-app purchase.