EXAMPLE AT A GLANCE
This fictional Sydney, New South Wales pitched roof covering replacement example contains 7 itemised costs totalling A$27,986.62. Its app-exported PDF uses the exact metric quantities and AUD rates in the table, with scope assumptions and exclusions explained below.
Project scope: One accessible pitched roof
Remove and replace the selected pitched roof covering on one defined roof, retaining sound supporting structure after inspection.
This original fictional example is set in Sydney, New South Wales. Harbour & Gum Projects and Alex Morgan are made-up parties. The matching Australian guide explains which measurements, product decisions and site conditions turn this brief into a client-ready quote.
- Example location
- Sydney, New South Wales
- Prepared by
- Harbour & Gum Projects · fictional business
- Prepared for
- Alex Morgan · fictional customer
- Issued / valid through
- 25 September 2026 / 25 October 2026
Itemised pitched roof covering replacement costs
These 7 AUD lines reproduce the native app export. Old covering removal is measured as 204.39 m²; Underlay allowance uses 204.39 m². Some lines are measured work while others are a product or site-task allowance. Read the unit before reusing the structure for a different job.
| Work item | Quantity | Unit rate | Amount |
|---|---|---|---|
| Roof survey and access allowance | 1 job | A$1,020.00 | A$1,020.00 |
| Old covering removal | 204.39 m² | A$23.00 | A$4,700.97 |
| Underlay allowance | 204.39 m² | A$12.00 | A$2,452.68 |
| Selected covering allowance | 222.97 m² | A$43.00 | A$9,587.71 |
| Covering installation | 204.39 m² | A$34.00 | A$6,949.26 |
| Flashings and edges | 1 job | A$2,100.00 | A$2,100.00 |
| Waste and final inspection | 1 job | A$1,176.00 | A$1,176.00 |
| Illustrative total | A$27,986.62 | ||
Product selection and installation should be clear from the descriptions. Confirm delivery, fixings, preparation, waste and any specialist trade responsibility for the actual job rather than assuming each allowance covers them.
Check the arithmetic
Old covering removal: 204.39 m² × A$23.00 = A$4,700.97. Underlay allowance: 204.39 m² × A$12.00 = A$2,452.68. All other lines use the same quantity-by-rate calculation and sum to A$27,986.62. Every fixture line lands on an exact cent, so the native PDF subtotal equals the displayed table total.
Measurement to check: Measure each roof plane, pitch, edges, penetrations and access; purchasing area differs from projected floor area. Selection to check: Separate covering, underlay, flashings and ventilation allowances. The PDF uses a 0% tax input only to make its fictional arithmetic visible. Confirm the GST treatment that applies to the actual job and set your own markup before sharing a client quote.
Assumptions and exclusions
Document safe access, weather protection and a staged tear-off before scheduling.
Outside this stated scope: No roof-framing replacement, solar array removal or concealed rot repair.
Unsound decking or hidden water damage requires a revised structural repair line. A changed condition should lead to a newly measured quantity, revised allowance or separately agreed task. Keep the client informed of the changed figure before producing another PDF.
Open the app-exported PDF
The document was exported from Estimates using the fictional business, client, dates, short PDF scope, notes and cost lines shown here. The image is the first-page preview. Open the complete PDF to check all entries; no rate is a current Sydney, New South Wales market claim.
Adapt this example to a real job
- Write the actual work boundary and site address; use this measurement basis: Measure each roof plane, pitch, edges, penetrations and access; purchasing area differs from projected floor area.
- Confirm products, access and handoff responsibilities; record this selection decision: Separate covering, underlay, flashings and ventilation allowances.
- Replace all fictional product, labour and subcontractor rates with your own evidence.
- Review quantities, extensions, total, GST and markup settings, client details and validity date.
- Preview every PDF page and share the quote with the agreed exclusions.
- Measure each roof plane, pitch, edges, penetrations and access; purchasing area differs from projected floor area.
- Separate covering, underlay, flashings and ventilation allowances.
- Document safe access, weather protection and a staged tear-off before scheduling.
- Unsound decking or hidden water damage requires a revised structural repair line.
Read the paired estimating guide for the project-specific scope and work sequence.
Questions about this estimate
Which quantity controls this whole roof covering replacement estimate?
Measure each roof plane, pitch, edges, penetrations and access; purchasing area differs from projected floor area.
When should this whole roof covering replacement quote be revised?
Unsound decking or hidden water damage requires a revised structural repair line. No roof-framing replacement, solar array removal or concealed rot repair.