EXAMPLE AT A GLANCE
This fictional Bunbury, Western Australia solar window film installation example contains 6 itemised costs totalling A$5,178.41. Its app-exported PDF uses the exact metric quantities and AUD rates in the table, with scope assumptions and exclusions explained below.
Project scope: Twelve glazed panes
Apply selected solar-control film to twelve clean, suitable glazed panes with defined edge finish.
This original fictional example is set in Bunbury, Western Australia. Harbour & Gum Projects and Alex Morgan are made-up parties. The matching Australian guide explains which measurements, product decisions and site conditions turn this brief into a client-ready quote.
- Example location
- Bunbury, Western Australia
- Prepared by
- Harbour & Gum Projects · fictional business
- Prepared for
- Alex Morgan · fictional customer
- Issued / valid through
- 25 September 2026 / 25 October 2026
Itemised solar window film installation costs
These 6 AUD lines reproduce the native app export. Pane cleaning is measured as 12 each; Film allowance uses 17.19 m². Some lines are measured work while others are a product or site-task allowance. Read the unit before reusing the structure for a different job.
| Work item | Quantity | Unit rate | Amount |
|---|---|---|---|
| Glazing survey and compatibility | 1 job | A$234.65 | A$234.65 |
| Pane cleaning | 12 each | A$30.87 | A$370.44 |
| Film allowance | 17.19 m² | A$106.00 | A$1,822.14 |
| Film cutting and fitting | 15.79 m² | A$146.00 | A$2,305.34 |
| Edge finishing | 12 each | A$22.23 | A$266.76 |
| Final inspection and cleanup | 1 job | A$179.08 | A$179.08 |
| Illustrative total | A$5,178.41 | ||
Product selection and installation should be clear from the descriptions. Confirm delivery, fixings, preparation, waste and any specialist trade responsibility for the actual job rather than assuming each allowance covers them.
Check the arithmetic
Pane cleaning: 12 each × A$30.87 = A$370.44. Film allowance: 17.19 m² × A$106.00 = A$1,822.14. All other lines use the same quantity-by-rate calculation and sum to A$5,178.41. Every fixture line lands on an exact cent, so the native PDF subtotal equals the displayed table total.
Measurement to check: Measure each glass pane, orientation and access; check glass type and any manufacturer restrictions. Selection to check: Separate film product grade, preparation and fitting labour. The PDF uses a 0% tax input only to make its fictional arithmetic visible. Confirm the GST treatment that applies to the actual job and set your own markup before sharing a client quote.
Assumptions and exclusions
Confirm film compatibility and do a representative pane before the full installation.
Outside this stated scope: No window replacement, blind installation or guaranteed energy-saving figure.
Damaged glazing or unsuitable glass can exclude a pane from the base scope. A changed condition should lead to a newly measured quantity, revised allowance or separately agreed task. Keep the client informed of the changed figure before producing another PDF.
Open the app-exported PDF
The document was exported from Estimates using the fictional business, client, dates, short PDF scope, notes and cost lines shown here. The image is the first-page preview. Open the complete PDF to check all entries; no rate is a current Bunbury, Western Australia market claim.
Adapt this example to a real job
- Write the actual work boundary and site address; use this measurement basis: Measure each glass pane, orientation and access; check glass type and any manufacturer restrictions.
- Confirm products, access and handoff responsibilities; record this selection decision: Separate film product grade, preparation and fitting labour.
- Replace all fictional product, labour and subcontractor rates with your own evidence.
- Review quantities, extensions, total, GST and markup settings, client details and validity date.
- Preview every PDF page and share the quote with the agreed exclusions.
- Measure each glass pane, orientation and access; check glass type and any manufacturer restrictions.
- Separate film product grade, preparation and fitting labour.
- Confirm film compatibility and do a representative pane before the full installation.
- Damaged glazing or unsuitable glass can exclude a pane from the base scope.
Read the paired estimating guide for the project-specific scope and work sequence.
Questions about this estimate
Which quantity controls this solar window film installation estimate?
Measure each glass pane, orientation and access; check glass type and any manufacturer restrictions.
When should this solar window film installation quote be revised?
Damaged glazing or unsuitable glass can exclude a pane from the base scope. No window replacement, blind installation or guaranteed energy-saving figure.
TURN THE SCOPE INTO AN ITEMISED PDF
Make your own solar window film installation estimate.
Describe the actual job in Estimates on iPhone or Android or use AI assistance to start a draft. Check every measurement, quantity, rate, allowance, client detail and note before exporting your PDF. Some app features may require an in-app purchase.