EXAMPLE AT A GLANCE
This fictional Sheffield sliding patio door replacement project has 7 itemised lines and an illustrative £5,192.00 total. The app-exported PDF, first-page preview, measurement basis, scope boundaries and matching UK estimating guide let you inspect every quantity and rate.
What this example covers
This fictional job is set in Sheffield and concerns one existing exterior opening. Replace one sliding patio door assembly within a sound existing opening, including sill flashing and interior trim allowance. The estimate is a bounded document: the customer should be able to compare the described work with its measured lines, product allowances and exclusions. The matching UK guide explains how to prepare those inputs.
- Prepared by
- Cedar & Beam Builders · fictional business
- Prepared for
- Jordan Taylor · fictional customer
- Example location
- Sheffield, UK
- Issued / valid through
- 25 September 2026 / 25 October 2026
Itemised sliding patio door replacement example
These 7 lines reproduce the app-exported PDF exactly. The largest is Door unit allowance at £2,720.00; this is one fictional component, not a typical price. Read each quantity with its unit: area, length, time, count and lump sum describe different work and must not be interchanged.
| Work item | Quantity | Unit rate | Amount |
|---|---|---|---|
| Opening survey and product check | 1 lump sum | £208.00 | £208.00 |
| Site and weather protection | 1 lump sum | £256.00 | £256.00 |
| Old door removal | 1 each | £384.00 | £384.00 |
| Door unit allowance | 1 each | £2,720.00 | £2,720.00 |
| Flashing and seal allowance | 1 lump sum | £288.00 | £288.00 |
| Door setting labour | 1 each | £920.00 | £920.00 |
| Trim and disposal | 1 lump sum | £416.00 | £416.00 |
| Illustrative total | £5,192.00 | ||
The table separates the named product or material allowances from labour and site tasks wherever the scope needs that distinction. Before replacing a rate, check whether the product allowance includes delivery, waste, fixings and the selected specification.
How the total is calculated
Opening survey and product check is 1 lump sum × £208.00 = £208.00. Site and weather protection is 1 lump sum × £256.00 = £256.00. The other lines follow the same calculation and sum to £5,192.00. Each fixture line lands on an exact penny, so the native PDF total equals the sum of the displayed line amounts.
Measurement to check: Measure opening in several positions, wall thickness, threshold height and access route. Selection to check: Separate the selected door unit, flashing and finish trim. The 0% tax field and zero markup are example document inputs, not an instruction for a live quote. Decide the correct settings for your own business and job.
Assumptions and exclusions
Confirm delivery and weather protection before removing the existing unit.
Outside this stated scope: No structural opening enlargement, adjacent deck repair or concealed wall repair.
Rotten sill framing or opening-size change adds work beyond replacement. A changed condition should lead to a newly measured quantity, explicit revised allowance or separately agreed task. Keep the customer informed of which figure changed and why before producing another PDF.
Download the app PDF
The document was exported from Estimates using the fictional business, client, dates, short PDF scope, notes and cost lines above. Its first page appears below. Download the complete PDF to inspect every entry and its presentation; no listed rate is a current Sheffield market claim.
Make an estimate for your own job
- Write the actual work boundary and exclusions. Use this measurement basis: Measure opening in several positions, wall thickness, threshold height and access route.
- Confirm the selected products and access conditions. Record this selection decision: Separate the selected door unit, flashing and finish trim.
- Replace every fictional product, labour and subcontractor rate with your own evidence.
- Check line extensions, total, tax and markup settings, customer details and validity date.
- Preview every PDF page before sharing the estimate with the customer.
- Measure opening in several positions, wall thickness, threshold height and access route.
- Separate the selected door unit, flashing and finish trim.
- Confirm delivery and weather protection before removing the existing unit.
- Rotten sill framing or opening-size change adds work beyond replacement.
Read the matching estimating guide for the project-specific measurement and work sequence.
Questions about this job
Which quantity controls this sliding patio door replacement estimate?
Measure opening in several positions, wall thickness, threshold height and access route.
When should this sliding patio door replacement quote be revised?
Rotten sill framing or opening-size change adds work beyond replacement. No structural opening enlargement, adjacent deck repair or concealed wall repair.
MAKE THE EXAMPLE YOUR OWN
Build a sliding patio door replacement estimate
Use Estimates on iPhone or Android to enter your measured scope and line items. Review the result carefully and export a PDF for the actual job.