EXAMPLE AT A GLANCE
This fictional Albury, New South Wales accessible entry ramp installation example contains 7 itemised costs totalling A$14,656.92. Its app-exported PDF uses the exact metric quantities and AUD rates in the table, with scope assumptions and exclusions explained below.
Project scope: One short private entry ramp
Build a short ramp at a private entry to a site-reviewed design with non-slip surface, edge protection and handrail allowance.
This original fictional example is set in Albury, New South Wales. Harbour & Gum Projects and Alex Morgan are made-up parties. The matching Australian guide explains which measurements, product decisions and site conditions turn this brief into a client-ready quote.
- Example location
- Albury, New South Wales
- Prepared by
- Harbour & Gum Projects · fictional business
- Prepared for
- Alex Morgan · fictional customer
- Issued / valid through
- 25 September 2026 / 25 October 2026
Itemised accessible entry ramp installation costs
These 7 AUD lines reproduce the native app export. Ramp construction labour is measured as 11.15 m²; Non-slip surface allowance uses 12.08 m². Some lines are measured work while others are a product or site-task allowance. Read the unit before reusing the structure for a different job.
| Work item | Quantity | Unit rate | Amount |
|---|---|---|---|
| Entry survey and design allowance | 1 job | A$725.20 | A$725.20 |
| Site preparation | 1 job | A$577.20 | A$577.20 |
| Frame or base material allowance | 1 job | A$2,146.00 | A$2,146.00 |
| Ramp construction labour | 11.15 m² | A$446.00 | A$4,972.90 |
| Non-slip surface allowance | 12.08 m² | A$191.25 | A$2,310.30 |
| Handrail and edge allowance | 10.97 m | A$316.00 | A$3,466.52 |
| Level check and cleanup | 1 job | A$458.80 | A$458.80 |
| Illustrative total | A$14,656.92 | ||
Product selection and installation should be clear from the descriptions. Confirm delivery, fixings, preparation, waste and any specialist trade responsibility for the actual job rather than assuming each allowance covers them.
Check the arithmetic
Ramp construction labour: 11.15 m² × A$446.00 = A$4,972.90. Non-slip surface allowance: 12.08 m² × A$191.25 = A$2,310.30. All other lines use the same quantity-by-rate calculation and sum to A$14,656.92. Every fixture line lands on an exact cent, so the native PDF subtotal equals the displayed table total.
Measurement to check: Survey rise, available run, landings, door swing and drainage; slope must follow locally applicable design. Selection to check: Separate structural material, surface and rail allowances. The PDF uses a 0% tax input only to make its fictional arithmetic visible. Confirm the GST treatment that applies to the actual job and set your own markup before sharing a client quote.
Assumptions and exclusions
Obtain the required design and permissions before construction; check levels at each stage.
Outside this stated scope: No accessibility certification, public footpath work or structural foundation redesign.
Insufficient available run or weak landing support changes the design. A changed condition should lead to a newly measured quantity, revised allowance or separately agreed task. Keep the client informed of the changed figure before producing another PDF.
Open the app-exported PDF
The document was exported from Estimates using the fictional business, client, dates, short PDF scope, notes and cost lines shown here. The image is the first-page preview. Open the complete PDF to check all entries; no rate is a current Albury, New South Wales market claim.
Adapt this example to a real job
- Write the actual work boundary and site address; use this measurement basis: Survey rise, available run, landings, door swing and drainage; slope must follow locally applicable design.
- Confirm products, access and handoff responsibilities; record this selection decision: Separate structural material, surface and rail allowances.
- Replace all fictional product, labour and subcontractor rates with your own evidence.
- Review quantities, extensions, total, GST and markup settings, client details and validity date.
- Preview every PDF page and share the quote with the agreed exclusions.
- Survey rise, available run, landings, door swing and drainage; slope must follow locally applicable design.
- Separate structural material, surface and rail allowances.
- Obtain the required design and permissions before construction; check levels at each stage.
- Insufficient available run or weak landing support changes the design.
Read the paired estimating guide for the project-specific scope and work sequence.
Questions about this estimate
Which quantity controls this accessible entry ramp installation estimate?
Survey rise, available run, landings, door swing and drainage; slope must follow locally applicable design.
When should this accessible entry ramp installation quote be revised?
Insufficient available run or weak landing support changes the design. No accessibility certification, public footpath work or structural foundation redesign.