EXAMPLE AT A GLANCE
This fictional electrical power point replacement quote for Gold Coast, Queensland has 6 itemised lines totalling A$1,500.80. Review the exact metric quantities and scope, then open the matching app-exported PDF. The 0% tax entry is only an example input.
The six existing-location power points scope
Replace six selected power points in existing suitable boxes and circuits. Include device allowance, faceplates, licensed installation labour, basic verification and cleanup. No new wiring, circuit correction or panel work; actual approvals and qualifications must be verified.
This is an original fictional job set in Gold Coast, Queensland. The location gives the example a recognisable setting; the rates are made-up inputs and do not describe local prices. Use the matching estimating guide to check what should be measured, selected or excluded on a real job.
- Prepared by
- Harbour & Gum Projects · fictional business
- Prepared for
- Alex Morgan · fictional customer
- Example location
- Gold Coast, Queensland
- Issued / valid through
- 25 September 2026 / 25 October 2026
Itemised electrical power point replacement example
Each amount is its quantity multiplied by its AUD unit rate, rounded to cents. These 6 entries match the fixture used to make the PDF. Metric surface and length units describe the priced work, not a conversion rule for another property.
| Work item | Quantity | Unit rate | Amount |
|---|---|---|---|
| Site review and circuit identification | 1 job | A$210.00 | A$210.00 |
| Power point device allowance | 6 each | A$39.20 | A$235.20 |
| Faceplate allowance | 6 each | A$9.80 | A$58.80 |
| Existing-device removal and replacement labour | 6 each | A$119.00 | A$714.00 |
| Basic verification and labelling | 6 each | A$30.80 | A$184.80 |
| Cleanup and old-device handling | 1 job | A$98.00 | A$98.00 |
| Subtotal / example total | A$1,500.80 | ||
Calculation check: 6 each × A$39.20 = A$235.20; 6 each × A$9.80 = A$58.80. The demonstration tax field is 0%, so the displayed total stays A$1,500.80. Determine tax and markup for your own work instead of using this input as guidance.
Assumptions and scope boundaries
The example assumes suitable boxes, wiring and circuit capacity. A damaged box or unsuitable connection changes the work and should be documented before added work is priced.
Outside this example: No new circuits, rewiring, panel work, box repair, concealed fault diagnosis or approval fees not specifically listed.
Selections, access or concealed conditions that differ from this scope require a revised quantity, allowance or separate line. The example deliberately separates them so the client can see what has and has not been priced.
Open the app-exported PDF
The PDF is a completed example exported from Estimates using this job data, fictional parties and the line amounts above. Read all pages to check notes as well as the total. The preview is the first page.
Adapt this example to your next job
- Replace the example location and project description with the actual site and client's requested result.
- Measure the work in the units shown, revising each quantity and product allowance to suit your plans and site inspection.
- Obtain your own supplier and labour inputs, then check access, protection, disposal and any specialist trade boundaries.
- Record exclusions and choices that remain open; review markup and tax for the actual quote.
- Preview every page of the PDF and check the item totals before sharing it.
- List every device location and type.
- Inspect existing boxes and circuits.
- Verify qualified-trade and approval requirements.
- Define testing and correction boundaries.
Common questions about electrical power point replacement
Can all power points use one unit price?
Only when device type and existing conditions match. Count special devices and difficult locations separately.
Are wiring repairs included in a replacement quote?
Not in this example. Document any discovered issue and provide a revised electrical scope before correction.