Maintenance · Canberra, Australian Capital Territory · AUD

Post-construction cleaning estimate example: Canberra, Australian Capital Territory PDF and itemised costs

Explore a post-construction cleaning estimate example for Canberra, Australian Capital Territory: 6 itemised AUD lines and a fictional total of A$3,170.30, with metric measurements, scope notes and an app-exported PDF.

EXAMPLE AT A GLANCE

This fictional post-construction cleaning quote for Canberra, Australian Capital Territory has 6 itemised lines totalling A$3,170.30. Review the exact metric quantities and scope, then open the matching app-exported PDF. The 0% tax entry is only an example input.

The 130.06 m² finished renovation area scope

Clean 130.06 m² of accessible finished renovation space after contractors remove their debris. Include dust removal from specified accessible surfaces, kitchen and bathroom fixture wipe-down, floor cleaning, 12 interior window units and final walkthrough. No hazardous dust remediation or bulk debris disposal.

This is an original fictional job set in Canberra, Australian Capital Territory. The location gives the example a recognisable setting; the rates are made-up inputs and do not describe local prices. Use the matching estimating guide to check what should be measured, selected or excluded on a real job.

Prepared by
Harbour & Gum Projects · fictional business
Prepared for
Alex Morgan · fictional customer
Example location
Canberra, Australian Capital Territory
Issued / valid through
25 September 2026 / 25 October 2026

Itemised post-construction cleaning example

Each amount is its quantity multiplied by its AUD unit rate, rounded to cents. These 6 entries match the fixture used to make the PDF. Metric surface and length units describe the priced work, not a conversion rule for another property.

Post-construction cleaning example — AUD
Work itemQuantityUnit rateAmount
Site walkthrough and setup1 jobA$252.00A$252.00
Surface dust removal130.06 m²A$9.50A$1,235.57
Floor cleaning130.06 m²A$5.50A$715.33
Kitchen and bath fixture detail3 roomsA$154.00A$462.00
Interior window cleaning12 eachA$25.20A$302.40
Final walkthrough and cleanup1 jobA$203.00A$203.00
Subtotal / example totalA$3,170.30

Calculation check: 130.06 m² × A$9.50 = A$1,235.57; 130.06 m² × A$5.50 = A$715.33. The demonstration tax field is 0%, so the displayed total stays A$3,170.30. Determine tax and markup for your own work instead of using this input as guidance.

Assumptions and scope boundaries

measured area covers broad dust and floors, while kitchens, baths and windows need their own counts. State whether cabinetry interiors or appliances are included.

Outside this example: No hazardous dust remediation, bulk debris disposal, exterior window cleaning, duct cleaning or cleaning after later trade work.

Selections, access or concealed conditions that differ from this scope require a revised quantity, allowance or separate line. The example deliberately separates them so the client can see what has and has not been priced.

Open the app-exported PDF

The PDF is a completed example exported from Estimates using this job data, fictional parties and the line amounts above. Read all pages to check notes as well as the total. The preview is the first page.

First page of the post-construction cleaning estimate PDF

Adapt this example to your next job

  1. Replace the example location and project description with the actual site and client's requested result.
  2. Measure the work in the units shown, revising each quantity and product allowance to suit your plans and site inspection.
  3. Obtain your own supplier and labour inputs, then check access, protection, disposal and any specialist trade boundaries.
  4. Record exclusions and choices that remain open; review markup and tax for the actual quote.
  5. Preview every page of the PDF and check the item totals before sharing it.
  • Confirm trades have removed bulk debris.
  • Measure finished cleaning area.
  • Count detail rooms and windows.
  • Agree a final checklist and rework boundary.

Common questions about post-construction cleaning

Is post-construction cleaning priced only per square metre?

Area covers broad surfaces, but detail rooms, windows and remaining debris need separate attention.

Who removes construction debris first?

State it explicitly. This example starts after the trades remove their bulk debris.

FROM SCOPE TO PDF

Make your own post-construction cleaning estimate.

Describe the actual job in Estimates on iPhone or Android, then review every quantity, rate and scope note. Add your business and client details, check the document and share an itemised PDF. Example amounts are fictional, and some app features may require an in-app purchase.

Plain-text version · Browse all samples

Less paperwork. More job done.

Your next estimate can start on site.

Download on the App StoreGet it on Google Play