EXAMPLE AT A GLANCE
This fictional Mackay, Queensland tree root barrier installation example contains 7 itemised costs totalling A$6,460.78. Its app-exported PDF uses the exact metric quantities and AUD rates in the table, with scope assumptions and exclusions explained below.
Project scope: One garden path edge
Install a specified root barrier along a garden path edge after confirming the tree and excavation constraints, then reinstate the disturbed surface.
This original fictional example is set in Mackay, Queensland. Harbour & Gum Projects and Alex Morgan are made-up parties. The matching Australian guide explains which measurements, product decisions and site conditions turn this brief into a client-ready quote.
- Example location
- Mackay, Queensland
- Prepared by
- Harbour & Gum Projects · fictional business
- Prepared for
- Alex Morgan · fictional customer
- Issued / valid through
- 25 September 2026 / 25 October 2026
Itemised tree root barrier installation costs
These 7 AUD lines reproduce the native app export. Careful trench excavation is measured as 16.76 m; Barrier material allowance uses 18.29 m. Some lines are measured work while others are a product or site-task allowance. Read the unit before reusing the structure for a different job.
| Work item | Quantity | Unit rate | Amount |
|---|---|---|---|
| Site and tree review allowance | 1 job | A$310.20 | A$310.20 |
| Surface protection and lift | 1 job | A$253.80 | A$253.80 |
| Careful trench excavation | 16.76 m | A$129.50 | A$2,170.42 |
| Barrier material allowance | 18.29 m | A$102.00 | A$1,865.58 |
| Joints and anchors | 1 job | A$296.10 | A$296.10 |
| Barrier placement labour | 16.76 m | A$55.50 | A$930.18 |
| Backfill and surface reinstatement | 1 job | A$634.50 | A$634.50 |
| Illustrative total | A$6,460.78 | ||
Product selection and installation should be clear from the descriptions. Confirm delivery, fixings, preparation, waste and any specialist trade responsibility for the actual job rather than assuming each allowance covers them.
Check the arithmetic
Careful trench excavation: 16.76 m × A$129.50 = A$2,170.42. Barrier material allowance: 18.29 m × A$102.00 = A$1,865.58. All other lines use the same quantity-by-rate calculation and sum to A$6,460.78. Every fixture line lands on an exact cent, so the native PDF subtotal equals the displayed table total.
Measurement to check: Measure barrier run, required depth and distance from the trunk; confirm tree protection constraints locally. Selection to check: Identify barrier product, joining strips and reinstatement material separately. The PDF uses a 0% tax input only to make its fictional arithmetic visible. Confirm the GST treatment that applies to the actual job and set your own markup before sharing a client quote.
Assumptions and exclusions
Agree a safe excavation method near roots before digging.
Outside this stated scope: No tree removal, arborist design or guaranteed control of all future roots.
Major roots or utilities in the trench may require a different route and professional review. A changed condition should lead to a newly measured quantity, revised allowance or separately agreed task. Keep the client informed of the changed figure before producing another PDF.
Open the app-exported PDF
The document was exported from Estimates using the fictional business, client, dates, short PDF scope, notes and cost lines shown here. The image is the first-page preview. Open the complete PDF to check all entries; no rate is a current Mackay, Queensland market claim.
Adapt this example to a real job
- Write the actual work boundary and site address; use this measurement basis: Measure barrier run, required depth and distance from the trunk; confirm tree protection constraints locally.
- Confirm products, access and handoff responsibilities; record this selection decision: Identify barrier product, joining strips and reinstatement material separately.
- Replace all fictional product, labour and subcontractor rates with your own evidence.
- Review quantities, extensions, total, GST and markup settings, client details and validity date.
- Preview every PDF page and share the quote with the agreed exclusions.
- Measure barrier run, required depth and distance from the trunk; confirm tree protection constraints locally.
- Identify barrier product, joining strips and reinstatement material separately.
- Agree a safe excavation method near roots before digging.
- Major roots or utilities in the trench may require a different route and professional review.
Read the paired estimating guide for the project-specific scope and work sequence.
Questions about this estimate
Which quantity controls this tree root barrier installation estimate?
Measure barrier run, required depth and distance from the trunk; confirm tree protection constraints locally.
When should this tree root barrier installation quote be revised?
Major roots or utilities in the trench may require a different route and professional review. No tree removal, arborist design or guaranteed control of all future roots.
TURN THE SCOPE INTO AN ITEMISED PDF
Make your own tree root barrier installation estimate.
Describe the actual job in Estimates on iPhone or Android or use AI assistance to start a draft. Check every measurement, quantity, rate, allowance, client detail and note before exporting your PDF. Some app features may require an in-app purchase.