THE SHORT ANSWER
Estimate fixture installation by fixture count, mounting requirements and existing box condition. State whether the customer supplies the fixtures and whether old-unit disposal is included.
Use this fictional four customer-supplied ceiling fixtures in Bristol to plan the estimate. The agreed work is: Install four customer-supplied ceiling light fixtures at existing suitable electrical boxes. Include removal of four old fixtures, a standard mounting-parts allowance, qualified labour, basic operation check and packaging clean-up. Fixture purchase, new switch legs, wiring and ceiling repair are excluded. The matching light fixture installation example and PDF shows the same inputs. These quantities and rates are teaching examples; use your own site measurements, product selections, supplier information and labour figures for a customer job.
1. List the fixtures by location
Record selected model, ceiling height and mounting detail. A pendant, flush mount and heavy specialty fixture should not be silently treated as the same work.
2. Confirm the mounting basis
The sample assumes suitable existing boxes and controls. Any box reinforcement, circuit change or wall/ceiling finish work requires separate review.
3. Define supply and handling
Customer-supplied fixtures still require receipt, inspection for missing parts and assembly time. Assign those tasks clearly to avoid ambiguity at installation.
4. Close out each location
Include a basic operation check and identify who handles packaging and removed fixtures. Verify any applicable approval and qualified-trade requirements for the property.
Calculate the measured lines
The PDF uses 6 separate items. For example, Existing fixture removal is 4 each × £44.00 = £176.00; Mounting parts allowance is 4 each × £28.00 = £112.00. Check that each unit describes the work being priced: area for a surface, metres for a run, and a count or defined lump sum for a discrete task. A material purchase allowance can differ from the installed quantity when product sizes, cuts or layout require it.
Adding the 6 rounded line amounts gives £1,012.00. The example PDF uses a 0% tax input and no markup; those settings do not determine how to price or treat an actual job. Do not copy the rates as a local price guide.
Check the scope before sending
- Record model and location for each fixture.
- Verify box and ceiling-height assumptions.
- Assign product and old-fixture handling.
- Confirm qualified-trade and approval requirements.
Outside the base scope: No fixture purchase, new wiring, switch relocation, box reinforcement, ceiling refinishing or specialty lift access.
Confirm the site address, selected products, access, quantities, customer details and validity date. If opening the work reveals a different condition, record the change and update the relevant line before asking the customer to approve the revised work. Preview every page of the PDF so the written scope, line amounts and total tell the same story.
Common questions
Does a light installation estimate include the fixtures?
This example is for customer-selected fixtures; no fixture purchase is listed. Add a product allowance when the contractor supplies them.
Should old fixtures be removed in a separate line?
Yes when removal is part of the work. It makes handling and disposal responsibilities easier to see.

FROM SITE NOTES TO AN ITEMISED PDF
Make your own light fixture installation estimate.
Enter the scope in Estimates on iPhone or Android, edit each quantity and rate in pounds, add your business and customer details, and review the PDF before sharing it.