EXAMPLE AT A GLANCE
This fictional Norwich bathroom fixture plumbing rough-in project has 7 itemised lines and an illustrative £5,238.53 total. The app-exported PDF, first-page preview, measurement basis, scope boundaries and matching UK estimating guide let you inspect every quantity and rate.
What this example covers
This fictional job is set in Norwich and concerns one three-fixture bathroom. Rough in water and waste connections for a toilet, basin and shower in an accessible room before finishes, against a confirmed fixture layout. The estimate is a bounded document: the customer should be able to compare the described work with its measured lines, product allowances and exclusions. The matching UK guide explains how to prepare those inputs.
- Prepared by
- Cedar & Beam Builders · fictional business
- Prepared for
- Jordan Taylor · fictional customer
- Example location
- Norwich, UK
- Issued / valid through
- 25 September 2026 / 25 October 2026
Itemised bathroom fixture plumbing rough-in example
These 7 lines reproduce the app-exported PDF exactly. The largest is Water rough-in labour at £1,520.00; this is one fictional component, not a typical price. Read each quantity with its unit: area, length, time, count and lump sum describe different work and must not be interchanged.
| Work item | Quantity | Unit rate | Amount |
|---|---|---|---|
| Layout and service survey | 1 lump sum | £224.00 | £224.00 |
| Access and chase preparation | 1 lump sum | £344.00 | £344.00 |
| Water pipe allowance | 25.9 metres | £36.70 | £950.53 |
| Drain pipe and fitting allowance | 1 lump sum | £576.00 | £576.00 |
| Water rough-in labour | 20 hours | £76.00 | £1,520.00 |
| Waste rough-in labour | 16 hours | £84.00 | £1,344.00 |
| Test and inspection preparation | 1 lump sum | £280.00 | £280.00 |
| Illustrative total | £5,238.53 | ||
The table separates the named product or material allowances from labour and site tasks wherever the scope needs that distinction. Before replacing a rate, check whether the product allowance includes delivery, waste, fixings and the selected specification.
How the total is calculated
Water pipe allowance is 25.9 metres × £36.70 = £950.53. Water rough-in labour is 20 hours × £76.00 = £1,520.00. The other lines follow the same calculation and sum to £5,238.53. Each fixture line lands on an exact penny, so the native PDF total equals the sum of the displayed line amounts.
Measurement to check: Set out each fixture centre, pipe route, chase, floor level and connection point from the selected layout. Selection to check: Identify pipe, fittings and fixture-specific connection allowances without assuming final trim products. The 0% tax field and zero markup are example document inputs, not an instruction for a live quote. Decide the correct settings for your own business and job.
Assumptions and exclusions
Coordinate wall framing and waterproofing handoff before concealing work.
Outside this stated scope: No final fixture supply, tiling, structural alterations or concealed service upgrade.
A layout change or unknown existing services alters pipe runs and access. A changed condition should lead to a newly measured quantity, explicit revised allowance or separately agreed task. Keep the customer informed of which figure changed and why before producing another PDF.
Download the app PDF
The document was exported from Estimates using the fictional business, client, dates, short PDF scope, notes and cost lines above. Its first page appears below. Download the complete PDF to inspect every entry and its presentation; no listed rate is a current Norwich market claim.
Make an estimate for your own job
- Write the actual work boundary and exclusions. Use this measurement basis: Set out each fixture centre, pipe route, chase, floor level and connection point from the selected layout.
- Confirm the selected products and access conditions. Record this selection decision: Identify pipe, fittings and fixture-specific connection allowances without assuming final trim products.
- Replace every fictional product, labour and subcontractor rate with your own evidence.
- Check line extensions, total, tax and markup settings, customer details and validity date.
- Preview every PDF page before sharing the estimate with the customer.
- Set out each fixture centre, pipe route, chase, floor level and connection point from the selected layout.
- Identify pipe, fittings and fixture-specific connection allowances without assuming final trim products.
- Coordinate wall framing and waterproofing handoff before concealing work.
- A layout change or unknown existing services alters pipe runs and access.
Read the matching estimating guide for the project-specific measurement and work sequence.
Questions about this job
Which quantity controls this bathroom fixture plumbing rough-in estimate?
Set out each fixture centre, pipe route, chase, floor level and connection point from the selected layout.
When should this bathroom fixture plumbing rough-in quote be revised?
A layout change or unknown existing services alters pipe runs and access. No final fixture supply, tiling, structural alterations or concealed service upgrade.
MAKE THE EXAMPLE YOUR OWN
Build a bathroom fixture plumbing rough-in estimate
Use Estimates on iPhone or Android to enter your measured scope and line items. Review the result carefully and export a PDF for the actual job.