EXAMPLE AT A GLANCE
This fictional Sydney, New South Wales home EV charger installation example contains 7 itemised costs totalling A$6,018.90. Its app-exported PDF uses the exact metric quantities and AUD rates in the table, with scope assumptions and exclusions explained below.
Project scope: One residential charging point
Install a selected home EV charger at a confirmed parking position with a defined cable route and existing-service assessment.
This original fictional example is set in Sydney, New South Wales. Harbour & Gum Projects and Alex Morgan are made-up parties. The matching Australian guide explains which measurements, product decisions and site conditions turn this brief into a client-ready quote.
- Example location
- Sydney, New South Wales
- Prepared by
- Harbour & Gum Projects · fictional business
- Prepared for
- Alex Morgan · fictional customer
- Issued / valid through
- 25 September 2026 / 25 October 2026
Itemised home EV charger installation costs
These 7 AUD lines reproduce the native app export. Charger unit allowance is measured as 1 each; Cable and containment allowance uses 19.81 m. Some lines are measured work while others are a product or site-task allowance. Read the unit before reusing the structure for a different job.
| Work item | Quantity | Unit rate | Amount |
|---|---|---|---|
| Site and load assessment allowance | 1 job | A$361.25 | A$361.25 |
| Charger unit allowance | 1 each | A$982.60 | A$982.60 |
| Cable and containment allowance | 19.81 m | A$85.00 | A$1,683.85 |
| Protective device allowance | 1 set | A$462.40 | A$462.40 |
| Cable routing labour | 10 hours | A$151.73 | A$1,517.30 |
| Mount and connect charger | 1 job | A$606.90 | A$606.90 |
| Testing and documentation | 1 job | A$404.60 | A$404.60 |
| Illustrative total | A$6,018.90 | ||
Product selection and installation should be clear from the descriptions. Confirm delivery, fixings, preparation, waste and any specialist trade responsibility for the actual job rather than assuming each allowance covers them.
Check the arithmetic
Charger unit allowance: 1 each × A$982.60 = A$982.60. Cable and containment allowance: 19.81 m × A$85.00 = A$1,683.85. All other lines use the same quantity-by-rate calculation and sum to A$6,018.90. Every fixture line lands on an exact cent, so the native PDF subtotal equals the displayed table total.
Measurement to check: Measure cable route, mounting position, panel capacity information and parking access before proposing equipment. Selection to check: Separate charger, cable and protective device allowances from installation labour. The PDF uses a 0% tax input only to make its fictional arithmetic visible. Confirm the GST treatment that applies to the actual job and set your own markup before sharing a client quote.
Assumptions and exclusions
A qualified installer must verify service and protective-device suitability before work.
Outside this stated scope: No service upgrade, trench across public land or utility-provider work.
Insufficient capacity or a longer concealed route requires a revised design. A changed condition should lead to a newly measured quantity, revised allowance or separately agreed task. Keep the client informed of the changed figure before producing another PDF.
Open the app-exported PDF
The document was exported from Estimates using the fictional business, client, dates, short PDF scope, notes and cost lines shown here. The image is the first-page preview. Open the complete PDF to check all entries; no rate is a current Sydney, New South Wales market claim.
Adapt this example to a real job
- Write the actual work boundary and site address; use this measurement basis: Measure cable route, mounting position, panel capacity information and parking access before proposing equipment.
- Confirm products, access and handoff responsibilities; record this selection decision: Separate charger, cable and protective device allowances from installation labour.
- Replace all fictional product, labour and subcontractor rates with your own evidence.
- Review quantities, extensions, total, GST and markup settings, client details and validity date.
- Preview every PDF page and share the quote with the agreed exclusions.
- Measure cable route, mounting position, panel capacity information and parking access before proposing equipment.
- Separate charger, cable and protective device allowances from installation labour.
- A qualified installer must verify service and protective-device suitability before work.
- Insufficient capacity or a longer concealed route requires a revised design.
Read the paired estimating guide for the project-specific scope and work sequence.
Questions about this estimate
Which quantity controls this home EV charger installation estimate?
Measure cable route, mounting position, panel capacity information and parking access before proposing equipment.
When should this home EV charger installation quote be revised?
Insufficient capacity or a longer concealed route requires a revised design. No service upgrade, trench across public land or utility-provider work.
TURN THE SCOPE INTO AN ITEMISED PDF
Make your own home EV charger installation estimate.
Describe the actual job in Estimates on iPhone or Android or use AI assistance to start a draft. Check every measurement, quantity, rate, allowance, client detail and note before exporting your PDF. Some app features may require an in-app purchase.