EXAMPLE AT A GLANCE
A home EV charger installation example for one residential charging point contains 7 itemized lines totaling $4,170.00 before tax or markup. The actual app PDF, measurement basis, project boundaries and a matching how-to guide are available here; every rate is fictional.
What this example covers
Install a selected home EV charger at a confirmed parking position with a defined cable route and existing-service assessment.
Use this example to see a complete document for one residential charging point. The brief is tied to Portland, Oregon for a plausible project setting; the amounts are fictional input values and do not represent local market prices. The estimating guide explains the decisions behind these lines.
- Prepared by
- Cedar & Beam Builders Β· fictional business
- Prepared for
- Jordan Taylor Β· fictional customer
- Example project
- One residential charging point
- Issued / valid through
- September 25, 2026 / October 25, 2026
Itemized home EV charger installation example
These are the same quantities and unit prices used by the downloadable app PDF. A cost line can represent measured work, a selected product allowance or a distinct site task. Check which interpretation applies before replacing any amount.
| Work item | Quantity | Unit price | Amount |
|---|---|---|---|
| Site and load assessment allowance | 1 job | $250.00 | $250.00 |
| Charger unit allowance | 1 each | $680.00 | $680.00 |
| Cable and containment allowance | 65 linear ft. | $18.00 | $1,170.00 |
| Protective device allowance | 1 set | $320.00 | $320.00 |
| Cable routing labor | 10 hours | $105.00 | $1,050.00 |
| Mount and connect charger | 1 job | $420.00 | $420.00 |
| Testing and documentation | 1 job | $280.00 | $280.00 |
| Subtotal / example total | $4,170.00 | ||
How the subtotal is calculated
The example line for cable and containment allowance is 65 linear ft. Γ $18.00 = $1,170.00. This line is one part of the complete 7-item estimate and uses a fictional unit rate.
The document sums the rounded line amounts to $4,170.00. Tax and markup are not included; a zero tax field in a sample document does not mean a real project is tax-exempt. Confirm the actual treatment for the job you are quoting.
Measurement to verify: Measure cable route, mounting position, panel capacity information and parking access before proposing equipment. Selection to verify: Separate charger, cable and protective device allowances from installation labor.
Assumptions and exclusions
A qualified installer must verify service and protective-device suitability before work.
Outside the stated scope: No service upgrade, trench across public land or utility-provider work.
Insufficient capacity or a longer concealed route requires a revised design. If the scope changes after a client reviews the estimate, update the relevant quantities, allowances and written exclusions before sharing a revised PDF.
Download the actual app PDF
The downloadable document was exported from Estimates using the fictional business, client, scope and cost lines shown above. The preview is its first page. Review the full PDF before using its layout or wording as a reference for your own estimate.
Build your own version
- Write the actual job boundary and measured quantities. Measurement basis to check: Measure cable route, mounting position, panel capacity information and parking access before proposing equipment.
- Confirm products, access and handoff responsibilities. Selection decision to record: Separate charger, cable and protective device allowances from installation labor.
- Replace every fictional rate with your own supplier, labor and subcontractor inputs.
- Add business and client details, set the appropriate tax and markup, then preview all PDF pages.
- Share the estimate with its exclusions and a clear validity date.
- Measure cable route, mounting position, panel capacity information and parking access before proposing equipment.
- Separate charger, cable and protective device allowances from installation labor.
- A qualified installer must verify service and protective-device suitability before work.
- Insufficient capacity or a longer concealed route requires a revised design.
Questions about this estimate
Which quantity controls this home EV charger installation estimate?
Measure cable route, mounting position, panel capacity information and parking access before proposing equipment.
When should this home EV charger installation quote be revised?
Insufficient capacity or a longer concealed route requires a revised design. No service upgrade, trench across public land or utility-provider work.
TURN THIS EXAMPLE INTO YOUR OWN ESTIMATE
Build a home EV charger installation estimate for your project
Use Estimates on iPhone or Android to draft a scope with AI assistance or enter each line yourself. Review quantities, rates, exclusions, and client details before exporting a PDF. The example is free to inspect; some app features may require an in-app purchase.