Renovation · Melbourne, Victoria · AUD

Kitchen renovation estimate example: Melbourne, Victoria PDF and itemised costs

Explore a kitchen renovation estimate example for Melbourne, Victoria: 8 itemised AUD lines and a fictional total of A$13,871.05, with metric measurements, scope notes and an app-exported PDF.

EXAMPLE AT A GLANCE

This fictional kitchen renovation quote for Melbourne, Victoria has 8 itemised lines totalling A$13,871.05. Review the exact metric quantities and scope, then open the matching app-exported PDF. The 0% tax entry is only an example input.

The keep-layout kitchen update scope

Update a kitchen while retaining the existing layout. Remove cabinets and counters, install 5.49 m of stock cabinets, allow for 3.25 m² of benchtop, reconnect existing sink services, replace splashback and paint affected walls. Appliances supplied by the owner.

This is an original fictional job set in Melbourne, Victoria. The location gives the example a recognisable setting; the rates are made-up inputs and do not describe local prices. Use the matching estimating guide to check what should be measured, selected or excluded on a real job.

Prepared by
Harbour & Gum Projects · fictional business
Prepared for
Alex Morgan · fictional customer
Example location
Melbourne, Victoria
Issued / valid through
25 September 2026 / 25 October 2026

Itemised kitchen renovation example

Each amount is its quantity multiplied by its AUD unit rate, rounded to cents. These 8 entries match the fixture used to make the PDF. Metric surface and length units describe the priced work, not a conversion rule for another property.

Kitchen renovation example — AUD
Work itemQuantityUnit rateAmount
Cabinet and counter removal1 jobA$1,260.00A$1,260.00
Stock cabinet material allowance5.49 mA$827.00A$4,540.23
Cabinet installation5.49 mA$390.00A$2,141.10
Benchtop supply and fit allowance3.25 m²A$979.52A$3,183.44
Splashback tile and installation2.79 m²A$332.00A$926.28
Sink and tap reconnection1 jobA$630.00A$630.00
Wall preparation and painting1 jobA$770.00A$770.00
Debris disposal1 jobA$420.00A$420.00
Subtotal / example totalA$13,871.05

Calculation check: 5.49 m × A$827.00 = A$4,540.23; 5.49 m × A$390.00 = A$2,141.10. The demonstration tax field is 0%, so the displayed total stays A$13,871.05. Determine tax and markup for your own work instead of using this input as guidance.

Assumptions and scope boundaries

A metre-based cabinet allowance can help explain an early example, but real cabinet pricing also depends on the unit schedule, drawers, end panels and accessories. Reconcile the allowance against the supplier’s actual list before presenting it as a final product price.

Outside this example: No wall removal, structural alterations, utility relocation or appliance purchase. Benchtop and cabinet selections remain example allowances.

Selections, access or concealed conditions that differ from this scope require a revised quantity, allowance or separate line. The example deliberately separates them so the client can see what has and has not been priced.

Open the app-exported PDF

The PDF is a completed example exported from Estimates using this job data, fictional parties and the line amounts above. Read all pages to check notes as well as the total. The preview is the first page.

First page of the kitchen renovation estimate PDF

Adapt this example to your next job

  1. Replace the example location and project description with the actual site and client's requested result.
  2. Measure the work in the units shown, revising each quantity and product allowance to suit your plans and site inspection.
  3. Obtain your own supplier and labour inputs, then check access, protection, disposal and any specialist trade boundaries.
  4. Record exclusions and choices that remain open; review markup and tax for the actual quote.
  5. Preview every page of the PDF and check the item totals before sharing it.
  • Reconcile cabinet quantities with a supplier list.
  • Identify sink cutouts, end panels and hardware.
  • Assign appliance delivery and installation responsibilities.
  • Separate layout changes from the keep-layout base scope.

Common questions about kitchen renovation

Can I quote a kitchen before all selections are final?

You can prepare an estimate with clearly labelled allowances. Explain which selections may change the total and replace the allowances with confirmed supplier quotes before treating them as fixed prices.

Should cabinets and benchtops be one line?

Separate them when they have different suppliers, quantities or selection assumptions. It makes scope changes and customer comparisons easier to understand.

FROM SCOPE TO PDF

Make your own kitchen renovation estimate.

Describe the actual job in Estimates on iPhone or Android, then review every quantity, rate and scope note. Add your business and client details, check the document and share an itemised PDF. Example amounts are fictional, and some app features may require an in-app purchase.

Plain-text version · Browse all samples

Less paperwork. More job done.

Your next estimate can start on site.

Download on the App StoreGet it on Google Play