Kitchen & bath · Vancouver, British Columbia · CAD

Shower wall tiling itemized cost breakdown and PDF in Canada

Inspect an app-exported shower wall tiling estimate for three shower walls in Vancouver, British Columbia. Check 7 CAD line items, a C$7,224.00 fictional total and the scope assumptions.

EXAMPLE AT A GLANCE

This fictional Vancouver, British Columbia shower wall tiling example contains 7 itemized costs totaling C$7,224.00 before tax or markup. The app-exported PDF uses the exact quantities and CAD rates shown in the table, with scope limits explained below.

Project scope: Three shower walls

Retile three sound shower walls within the existing enclosure, including substrate preparation, waterproofing allowance, tile setting and grout. Fixtures stay in place.

The fictional project is set in Vancouver, British Columbia. Cedar & Beam Builders and Jordan Taylor are example names, not a contractor and client case study. The matching guide explains how measurement, product selection and site conditions affect the estimate.

Location
Vancouver, British Columbia
Prepared by
Cedar & Beam Builders · fictional business
Prepared for
Jordan Taylor · fictional client
Issued / valid through
September 25 / October 25, 2026

The 7 CAD cost lines

The table uses the exact items, quantities and unit rates in the app-exported PDF. Multiply each quantity by its rate to check the amount. These chosen figures demonstrate the document; they are not surveyed prices or suggested rates for Vancouver, British Columbia.

Shower wall tiling example · CAD
Work itemQuantityUnit rateAmount
Wet-area protection1 jobC$210.00C$210.00
Existing tile removal95 sq. ft.C$11.00C$1,045.00
Substrate and waterproofing allowance95 sq. ft.C$17.00C$1,615.00
Tile material allowance105 sq. ft.C$9.80C$1,029.00
Tile setting labour95 sq. ft.C$27.00C$2,565.00
Edge trim and grout1 jobC$450.00C$450.00
Cleanup and screen refit allowance1 jobC$310.00C$310.00
Illustrative subtotalC$7,224.00

Check the arithmetic

  • Existing tile removal: 95 sq. ft. × C$11.00 = C$1,045.00.
  • Substrate and waterproofing allowance: 95 sq. ft. × C$17.00 = C$1,615.00.

The rounded line amounts add to C$7,224.00. The PDF's tax field is 0%, so its illustrated total stays C$7,224.00 before any markup. The sample shows 0% tax only to make the arithmetic visible. Determine any applicable GST, HST or PST and markup for the actual work before sharing a quote.

Measurement to verify: Measure each wet wall separately and record niches, corners and tile size so purchasing and installed areas are distinct. Product decision: Keep tile, edge trim and waterproofing products visible as separate selected or provisional items.

The existing tile removal line uses 95 sq. ft., approximately 8.83 m². Keep the actual site measurement and the supplier’s selling unit together when you replace this quantity.

Assumptions and exclusions

Allow demolition, substrate inspection and curing stages before the screen is refitted.

Outside this example: No shower tray replacement, plumbing alteration or hidden framing repair.

Unsound backing discovered after tile removal requires a separate substrate repair decision. Verify the existing water, waste and fixture connections on site. Confirm who handles any required trade work, approvals and inspections for this address; this fictional document does not decide them. Confirm a change and update the estimate before adding work that was not in the base scope.

Download the actual app PDF

The PDF was exported from Estimates for this fictional Canadian job. It carries a concise version of the project scope, plus the same customer, cost lines, CAD amounts and total used here. Its note covers the fictional tax setting and the brief's full exclusion sentence; the article records additional assumptions that do not fit in that PDF note.

First page of the fictional Vancouver, British Columbia shower wall tiling PDF estimate

Build the next estimate from your own inputs

  1. Measure the actual site and describe the work boundary in plain language.
  2. Confirm the selected products, access and handoff responsibilities with the client.
  3. Replace every fictional rate with your own labour, supplier and subcontractor figures.
  4. Check the relevant GST, HST or PST treatment and markup for the job without copying this sample's zero entry.
  5. Preview each PDF page, total and exclusion note before sharing.
  • Measure each wet wall separately and record niches, corners and tile size so purchasing and installed areas are distinct.
  • Keep tile, edge trim and waterproofing products visible as separate selected or provisional items.
  • Allow demolition, substrate inspection and curing stages before the screen is refitted.
  • Unsound backing discovered after tile removal requires a separate substrate repair decision.

Questions about this estimate

Which quantity controls this shower wall tiling estimate?

Measure each wet wall separately and record niches, corners and tile size so purchasing and installed areas are distinct.

When should this shower wall tiling quote be revised?

Unsound backing discovered after tile removal requires a separate substrate repair decision. No shower tray replacement, plumbing alteration or hidden framing repair.

MAKE THE NEXT ESTIMATE YOUR OWN

Build a shower wall tiling estimate.

Enter the job scope in Estimates on iPhone or Android or start from an AI-assisted draft. Check every quantity, rate, allowance, client detail and note before exporting the PDF. Some app features may require an in-app purchase.

Plain-text version · Browse all samples

Make the next estimate clearer.

Your scope and your pricing, together in one PDF.

Download on the App StoreGet it on Google Play