Kitchen & bath Β· Columbus, Ohio Β· USD

Shower wall tiling itemized cost breakdown and PDF

Download an app-generated shower wall tiling estimate PDF for three shower walls. Review 7 itemized lines, a $5,130.00 fictional subtotal and clear exclusions.

EXAMPLE AT A GLANCE

A shower wall tiling example for three shower walls contains 7 itemized lines totaling $5,130.00 before tax or markup. The actual app PDF, measurement basis, project boundaries and a matching how-to guide are available here; every rate is fictional.

What this example covers

Retile three sound shower walls within the existing enclosure, including substrate preparation, waterproofing allowance, tile setting and grout. Fixtures stay in place.

Use this example to see a complete document for three shower walls. The brief is tied to Columbus, Ohio for a plausible project setting; the amounts are fictional input values and do not represent local market prices. The estimating guide explains the decisions behind these lines.

Prepared by
Cedar & Beam Builders Β· fictional business
Prepared for
Jordan Taylor Β· fictional customer
Example project
Three shower walls
Issued / valid through
September 25, 2026 / October 25, 2026

Itemized shower wall tiling example

These are the same quantities and unit prices used by the downloadable app PDF. A cost line can represent measured work, a selected product allowance or a distinct site task. Check which interpretation applies before replacing any amount.

Shower wall tiling example β€” USD
Work itemQuantityUnit priceAmount
Wet-area protection1 job$150.00$150.00
Existing tile removal95 sq. ft.$8.00$760.00
Substrate and waterproofing allowance95 sq. ft.$12.00$1,140.00
Tile material allowance105 sq. ft.$7.00$735.00
Tile setting labor95 sq. ft.$19.00$1,805.00
Edge trim and grout1 job$320.00$320.00
Cleanup and screen refit allowance1 job$220.00$220.00
Subtotal / example total$5,130.00

How the subtotal is calculated

The example line for existing tile removal is 95 sq. ft. Γ— $8.00 = $760.00. This line is one part of the complete 7-item estimate and uses a fictional unit rate.

The document sums the rounded line amounts to $5,130.00. Tax and markup are not included; a zero tax field in a sample document does not mean a real project is tax-exempt. Confirm the actual treatment for the job you are quoting.

Measurement to verify: Measure each wet wall separately and record niches, corners and tile size so purchasing and installed areas are distinct. Selection to verify: Keep tile, edge trim and waterproofing products visible as separate selected or provisional items.

Assumptions and exclusions

Allow demolition, substrate inspection and curing stages before the screen is refitted.

Outside the stated scope: No shower tray replacement, plumbing alteration or hidden framing repair.

Unsound backing discovered after tile removal requires a separate substrate repair decision. If the scope changes after a client reviews the estimate, update the relevant quantities, allowances and written exclusions before sharing a revised PDF.

Download the actual app PDF

The downloadable document was exported from Estimates using the fictional business, client, scope and cost lines shown above. The preview is its first page. Review the full PDF before using its layout or wording as a reference for your own estimate.

First page of the fictional shower wall tiling estimate PDF

Build your own version

  1. Write the actual job boundary and measured quantities. Measurement basis to check: Measure each wet wall separately and record niches, corners and tile size so purchasing and installed areas are distinct.
  2. Confirm products, access and handoff responsibilities. Selection decision to record: Keep tile, edge trim and waterproofing products visible as separate selected or provisional items.
  3. Replace every fictional rate with your own supplier, labor and subcontractor inputs.
  4. Add business and client details, set the appropriate tax and markup, then preview all PDF pages.
  5. Share the estimate with its exclusions and a clear validity date.
  • Measure each wet wall separately and record niches, corners and tile size so purchasing and installed areas are distinct.
  • Keep tile, edge trim and waterproofing products visible as separate selected or provisional items.
  • Allow demolition, substrate inspection and curing stages before the screen is refitted.
  • Unsound backing discovered after tile removal requires a separate substrate repair decision.

Questions about this estimate

Which quantity controls this shower wall tiling estimate?

Measure each wet wall separately and record niches, corners and tile size so purchasing and installed areas are distinct.

When should this shower wall tiling quote be revised?

Unsound backing discovered after tile removal requires a separate substrate repair decision. No shower tray replacement, plumbing alteration or hidden framing repair.

TURN THIS EXAMPLE INTO YOUR OWN ESTIMATE

Build a shower wall tiling estimate for your project

Use Estimates on iPhone or Android to draft a scope with AI assistance or enter each line yourself. Review quantities, rates, exclusions, and client details before exporting a PDF. The example is free to inspect; some app features may require an in-app purchase.

Plain-text version Β· Browse all samples

Less desk time. More job done.

Your next estimate is already in your pocket.

Download on the App StoreGet it on Google Play