Decking repair estimate example in Glasgow: itemised PDF

Review a fictional Glasgow decking repair project with 7 exact line items, £1,452.00 illustrative total and an app-exported PDF.

EXAMPLE AT A GLANCE

This Glasgow example prices accessible deck-board replacement with 7 itemised lines and a £1,452.00 illustrative total. It uses fictional prices, a 0% tax input and no markup; verify all inputs for an actual job.

A defined decking repair job

This fictional project is located in Glasgow. Replace 20 accessible deck boards on an existing deck after confirming the supporting structure is suitable. Include removal, replacement-board and fastener allowance, fitting, a small rail repair allowance and waste disposal. No full refinishing. The written scope is the boundary of the example: a customer should be able to match each planned task to a line in the document, and see where a product choice or hidden condition still needs checking.

Prepared by
Cedar & Beam Builders · fictional business
Prepared for
Jordan Taylor · fictional customer
Example location
Glasgow, UK
Issued / valid through
25 September 2026 / 25 October 2026

Read every amount in pounds

The table reproduces the fixture sent to the app exporter. Each amount is its quantity multiplied by the shown unit rate, rounded to pence. The largest line is Replacement board allowance at £448.00; that is a part of the total, not a standard price for work of this kind. Check the unit, quantity and scope together before comparing lines with a real supplier or subcontractor quote.

Decking repair in Glasgow — GBP, fictional inputs
Work itemQuantityUnit rateAmount
Work-area setup1 lump sum£100.00£100.00
Selected board removal20 each£9.60£192.00
Replacement board allowance20 each£22.40£448.00
Fasteners and consumables1 lump sum£68.00£68.00
Board fitting and installation20 each£19.20£384.00
Minor rail repair allowance1 lump sum£140.00£140.00
Disposal and clean-up1 lump sum£120.00£120.00
Subtotal / example total£1,452.00

For a quick cross-check, selected board removal is 20 each × £9.60 = £192.00, and replacement board allowance is 20 each × £22.40 = £448.00. The sum of all 7 line amounts is £1,452.00. The PDF's 0% tax input and zero markup are example settings; determine the correct inputs for your own work.

What this example assumes

Visible surface damage may not describe the condition underneath. The example assumes the supporting structure has already been found suitable. If that has not been established, explain what must be checked before confirming the repair scope.

Work outside the example: No new footings, structural reconstruction, full railing replacement, staining or certification of existing structural adequacy.

The quantity basis matters. Where a product allowance differs from an installation quantity, the difference reflects this fictional layout or purchase plan and must be checked against the selected product. Existing conditions, safe access and any necessary approvals remain project decisions. Agree how changed measurements or discoveries will be recorded and priced before extra work begins.

View the app-exported PDF

The PDF was generated from this fictional project, with the exact line items, dates, customer and business details stated here. It is a completed example document for learning how an itemised estimate reads. Its prices are illustrative and are not current Glasgow market rates.

First page of the decking repair estimate PDF for a fictional Glasgow job

Build an estimate for your own job

Start with a measured site record and the customer's selected finish or equipment. Replace all fictional quantities and rates, assign responsibility for supply and waste removal, and check that the exclusions describe the actual boundary. Review each extended amount, total and note in the PDF before sharing it.

  • Identify and measure the included boards.
  • Confirm supporting-condition assumptions.
  • Specify replacement material and finish expectations.
  • Agree how additional damaged components will be priced.

Read the matching decking repair estimating guide for the measurement and scope decisions behind the example.

Common questions

Can a deck repair quote cover hidden structural damage?

Only when that work has been assessed and scoped. A surface-repair example should explicitly distinguish its included work from unknown or structural repairs.

Should staining be in a board-replacement estimate?

Include it only when agreed. Explain whether new boards are left unfinished, locally coated or part of a separately priced full refinishing scope.

Plain-text version · Browse all samples

Less paperwork. More time for the job.

Make your next estimate on iPhone or Android, then review it before sharing.

Download on the App StoreGet it on Google Play