Office partition installation estimate example in Southampton: itemised PDF

Download a fictional UK office partition installation estimate PDF with 7 itemised lines totalling £13,129.99. Check the quantities, GBP rates, scope and exclusions.

EXAMPLE AT A GLANCE

This fictional Southampton office partition installation project has 7 itemised lines and an illustrative £13,129.99 total. The app-exported PDF, first-page preview, measurement basis, scope boundaries and matching UK estimating guide let you inspect every quantity and rate.

What this example covers

This fictional job is set in Southampton and concerns two non-load-bearing office partitions. Build two non-load-bearing office partitions in an accessible suite, with selected glazing or door openings recorded separately. The estimate is a bounded document: the customer should be able to compare the described work with its measured lines, product allowances and exclusions. The matching UK guide explains how to prepare those inputs.

Prepared by
Cedar & Beam Builders · fictional business
Prepared for
Jordan Taylor · fictional customer
Example location
Southampton, UK
Issued / valid through
25 September 2026 / 25 October 2026

Itemised office partition installation example

These 7 lines reproduce the app-exported PDF exactly. The largest is Partition assembly labour at £5,753.81; this is one fictional component, not a typical price. Read each quantity with its unit: area, length, time, count and lump sum describe different work and must not be interchanged.

Office partition installation in Southampton — GBP, fictional inputs
Work itemQuantityUnit rateAmount
Layout and building review1 lump sum£312.00£312.00
Site protection1 lump sum£192.00£192.00
Framing allowance20.7 metres£110.20£2,281.14
Board and acoustic fill allowance57.6 sq m£51.65£2,975.04
Partition assembly labour55.7 sq m£103.30£5,753.81
Door opening kit allowance2 each£496.00£992.00
Joint finish and clean-up1 lump sum£624.00£624.00
Illustrative total£13,129.99

The table separates the named product or material allowances from labour and site tasks wherever the scope needs that distinction. Before replacing a rate, check whether the product allowance includes delivery, waste, fixings and the selected specification.

How the total is calculated

Framing allowance is 20.7 metres × £110.20 = £2,281.14. Board and acoustic fill allowance is 57.6 sq m × £51.65 = £2,975.04. The other lines follow the same calculation and sum to £13,129.99. Each fixture line lands on an exact penny, so the native PDF total equals the sum of the displayed line amounts.

Measurement to check: Measure partition lengths, heights, ceiling interface and service conflicts. Selection to check: Separate framing, board, acoustic fill and door or glazed components. The 0% tax field and zero markup are example document inputs, not an instruction for a live quote. Decide the correct settings for your own business and job.

Assumptions and exclusions

Agree a layout and building handoff before material procurement.

Outside this stated scope: No structural work, ventilation relocation or unapproved compliance certification.

Fire, acoustic or landlord requirements may change specification after review. A changed condition should lead to a newly measured quantity, explicit revised allowance or separately agreed task. Keep the customer informed of which figure changed and why before producing another PDF.

Download the app PDF

The document was exported from Estimates using the fictional business, client, dates, short PDF scope, notes and cost lines above. Its first page appears below. Download the complete PDF to inspect every entry and its presentation; no listed rate is a current Southampton market claim.

First page of the fictional office partition installation estimate PDF

Make an estimate for your own job

  1. Write the actual work boundary and exclusions. Use this measurement basis: Measure partition lengths, heights, ceiling interface and service conflicts.
  2. Confirm the selected products and access conditions. Record this selection decision: Separate framing, board, acoustic fill and door or glazed components.
  3. Replace every fictional product, labour and subcontractor rate with your own evidence.
  4. Check line extensions, total, tax and markup settings, customer details and validity date.
  5. Preview every PDF page before sharing the estimate with the customer.
  • Measure partition lengths, heights, ceiling interface and service conflicts.
  • Separate framing, board, acoustic fill and door or glazed components.
  • Agree a layout and building handoff before material procurement.
  • Fire, acoustic or landlord requirements may change specification after review.

Read the matching estimating guide for the project-specific measurement and work sequence.

Questions about this job

Which quantity controls this office partition installation estimate?

Measure partition lengths, heights, ceiling interface and service conflicts.

When should this office partition installation quote be revised?

Fire, acoustic or landlord requirements may change specification after review. No structural work, ventilation relocation or unapproved compliance certification.

MAKE THE EXAMPLE YOUR OWN

Build an office partition installation estimate

Use Estimates on iPhone or Android to enter your measured scope and line items. Review the result carefully and export a PDF for the actual job.

Plain-text version · Browse all samples

Less paperwork. More time for the job.

Make your next estimate on iPhone or Android, then review it before sharing.

Download on the App StoreGet it on Google Play