An office partition installation example for two non-load-bearing office partitions contains 7 itemized lines totaling $16,426.00 before tax or markup. The actual app PDF, measurement basis, project boundaries and a matching how-to guide are available here; every rate is fictional.

What this example covers

Build two non-load-bearing office partitions in an accessible suite, with selected glazing or door openings recorded separately.

Use this example to see a complete document for two non-load-bearing office partitions. The brief is tied to Richmond, Virginia for a plausible project setting; the amounts are fictional input values and do not represent local market prices. The estimating guide explains the decisions behind these lines.

Prepared by
Cedar & Beam Builders Β· fictional business
Prepared for
Jordan Taylor Β· fictional customer
Example project
Two non-load-bearing office partitions
Issued / valid through
September 25, 2026 / October 25, 2026

Itemized office partition installation example

These are the same quantities and unit prices used by the downloadable app PDF. A cost line can represent measured work, a selected product allowance or a distinct site task. Check which interpretation applies before replacing any amount.

Office partition installation example β€” USD
Work itemQuantityUnit priceAmount
Layout and building review1 job$390.00$390.00
Site protection1 job$240.00$240.00
Framing allowance68 linear ft.$42.00$2,856.00
Board and acoustic fill allowance620 sq. ft.$6.00$3,720.00
Partition assembly labor600 sq. ft.$12.00$7,200.00
Door opening kit allowance2 each$620.00$1,240.00
Joint finish and cleanup1 job$780.00$780.00
Subtotal / example total$16,426.00

How the subtotal is calculated

The example line for framing allowance is 68 linear ft. Γ— $42.00 = $2,856.00. This line is one part of the complete 7-item estimate and uses a fictional unit rate.

The document sums the rounded line amounts to $16,426.00. Tax and markup are not included; a zero tax field in a sample document does not mean a real project is tax-exempt. Confirm the actual treatment for the job you are quoting.

Measurement to verify: Measure partition lengths, heights, ceiling interface and service conflicts. Selection to verify: Separate framing, board, acoustic fill and door or glazed components.

Assumptions and exclusions

Agree a layout and building handoff before material procurement.

Outside the stated scope: No structural work, HVAC relocation or unapproved compliance certification.

Fire, acoustic or landlord requirements may change specification after review. If the scope changes after a client reviews the estimate, update the relevant quantities, allowances and written exclusions before sharing a revised PDF.

Download the actual app PDF

The downloadable document was exported from Estimates using the fictional business, client, scope and cost lines shown above. The preview is its first page. Review the full PDF before using its layout or wording as a reference for your own estimate.

First page of the fictional office partition installation estimate PDF

Build your own version

  1. Write the actual job boundary and measured quantities. Measurement basis to check: Measure partition lengths, heights, ceiling interface and service conflicts.
  2. Confirm products, access and handoff responsibilities. Selection decision to record: Separate framing, board, acoustic fill and door or glazed components.
  3. Replace every fictional rate with your own supplier, labor and subcontractor inputs.
  4. Add business and client details, set the appropriate tax and markup, then preview all PDF pages.
  5. Share the estimate with its exclusions and a clear validity date.
  • Measure partition lengths, heights, ceiling interface and service conflicts.
  • Separate framing, board, acoustic fill and door or glazed components.
  • Agree a layout and building handoff before material procurement.
  • Fire, acoustic or landlord requirements may change specification after review.

Questions about this estimate

Which quantity controls this office partition installation estimate?

Measure partition lengths, heights, ceiling interface and service conflicts.

When should this office partition installation quote be revised?

Fire, acoustic or landlord requirements may change specification after review. No structural work, HVAC relocation or unapproved compliance certification.

TURN THIS EXAMPLE INTO YOUR OWN ESTIMATE

Build an office partition installation estimate for your project

Use Estimates on iPhone or Android to draft a scope with AI assistance or enter each line yourself. Review quantities, rates, exclusions, and client details before exporting a PDF. The example is free to inspect; some app features may require an in-app purchase.

Plain-text version Β· Browse all samples

Less desk time. More job done.

Your next estimate is already in your pocket.

Download on the App StoreGet it on Google Play