EXAMPLE AT A GLANCE
A balcony waterproofing renewal example for one accessible balcony deck contains 7 itemized lines totaling $7,200.00 before tax or markup. The actual app PDF, measurement basis, project boundaries and a matching how-to guide are available here; every rate is fictional.
What this example covers
Renew the waterproof surface system on one small accessible balcony, including edge and outlet details on a sound substrate.
Use this example to see a complete document for one accessible balcony deck. The brief is tied to Tampa, Florida for a plausible project setting; the amounts are fictional input values and do not represent local market prices. The estimating guide explains the decisions behind these lines.
- Prepared by
- Cedar & Beam Builders Β· fictional business
- Prepared for
- Jordan Taylor Β· fictional customer
- Example project
- One accessible balcony deck
- Issued / valid through
- September 25, 2026 / October 25, 2026
Itemized balcony waterproofing renewal example
These are the same quantities and unit prices used by the downloadable app PDF. A cost line can represent measured work, a selected product allowance or a distinct site task. Check which interpretation applies before replacing any amount.
| Work item | Quantity | Unit price | Amount |
|---|---|---|---|
| Access and weather protection | 1 job | $330.00 | $330.00 |
| Existing finish removal | 120 sq. ft. | $7.00 | $840.00 |
| Substrate preparation | 120 sq. ft. | $6.00 | $720.00 |
| Waterproof system allowance | 130 sq. ft. | $15.00 | $1,950.00 |
| Application labor | 120 sq. ft. | $20.00 | $2,400.00 |
| Edge and outlet detailing | 1 job | $750.00 | $750.00 |
| Final inspection and cleanup | 1 job | $210.00 | $210.00 |
| Subtotal / example total | $7,200.00 | ||
How the subtotal is calculated
The example line for existing finish removal is 120 sq. ft. Γ $7.00 = $840.00. This line is one part of the complete 7-item estimate and uses a fictional unit rate.
The document sums the rounded line amounts to $7,200.00. Tax and markup are not included; a zero tax field in a sample document does not mean a real project is tax-exempt. Confirm the actual treatment for the job you are quoting.
Measurement to verify: Measure deck area, threshold height, upstands, edge length and drainage outlet. Selection to verify: Specify the membrane or coating system and edge profiles separately.
Assumptions and exclusions
Remove existing finish, inspect substrate and confirm drainage fall before applying the new system.
Outside the stated scope: No structural deck replacement, new railing or interior damage repair.
Hidden substrate rot or inadequate fall requires a revised build-up. If the scope changes after a client reviews the estimate, update the relevant quantities, allowances and written exclusions before sharing a revised PDF.
Download the actual app PDF
The downloadable document was exported from Estimates using the fictional business, client, scope and cost lines shown above. The preview is its first page. Review the full PDF before using its layout or wording as a reference for your own estimate.
Build your own version
- Write the actual job boundary and measured quantities. Measurement basis to check: Measure deck area, threshold height, upstands, edge length and drainage outlet.
- Confirm products, access and handoff responsibilities. Selection decision to record: Specify the membrane or coating system and edge profiles separately.
- Replace every fictional rate with your own supplier, labor and subcontractor inputs.
- Add business and client details, set the appropriate tax and markup, then preview all PDF pages.
- Share the estimate with its exclusions and a clear validity date.
- Measure deck area, threshold height, upstands, edge length and drainage outlet.
- Specify the membrane or coating system and edge profiles separately.
- Remove existing finish, inspect substrate and confirm drainage fall before applying the new system.
- Hidden substrate rot or inadequate fall requires a revised build-up.
Questions about this estimate
Which quantity controls this balcony waterproofing renewal estimate?
Measure deck area, threshold height, upstands, edge length and drainage outlet.
When should this balcony waterproofing renewal quote be revised?
Hidden substrate rot or inadequate fall requires a revised build-up. No structural deck replacement, new railing or interior damage repair.