EXAMPLE AT A GLANCE
This fictional Sydney, New South Wales bath to shower conversion example contains 7 itemised costs totalling A$7,194.83. Its app-exported PDF uses the exact metric quantities and AUD rates in the table, with scope assumptions and exclusions explained below.
Project scope: One existing bath alcove
Remove one bath and fit a shower in the same alcove, with a new base, wall finish, valve trim and screen allowance. Existing supply and drain positions remain.
This original fictional example is set in Sydney, New South Wales. Harbour & Gum Projects and Alex Morgan are made-up parties. The matching Australian guide explains which measurements, product decisions and site conditions turn this brief into a client-ready quote.
- Example location
- Sydney, New South Wales
- Prepared by
- Harbour & Gum Projects · fictional business
- Prepared for
- Alex Morgan · fictional customer
- Issued / valid through
- 25 September 2026 / 25 October 2026
Itemised bath to shower conversion costs
These 7 AUD lines reproduce the native app export. Shower base allowance is measured as 1 each; Wet-wall preparation and waterproofing uses 6.97 m². Some lines are measured work while others are a product or site-task allowance. Read the unit before reusing the structure for a different job.
| Work item | Quantity | Unit rate | Amount |
|---|---|---|---|
| Dust protection | 1 job | A$209.55 | A$209.55 |
| Bath and surround removal | 1 job | A$533.40 | A$533.40 |
| Shower base allowance | 1 each | A$965.20 | A$965.20 |
| Wet-wall preparation and waterproofing | 6.97 m² | A$246.00 | A$1,714.62 |
| Wall finish installation | 6.97 m² | A$328.00 | A$2,286.16 |
| Valve trim and screen allowance | 1 set | A$1,244.60 | A$1,244.60 |
| Disposal and final seal | 1 job | A$241.30 | A$241.30 |
| Illustrative total | A$7,194.83 | ||
Product selection and installation should be clear from the descriptions. Confirm delivery, fixings, preparation, waste and any specialist trade responsibility for the actual job rather than assuming each allowance covers them.
Check the arithmetic
Shower base allowance: 1 each × A$965.20 = A$965.20. Wet-wall preparation and waterproofing: 6.97 m² × A$246.00 = A$1,714.62. All other lines use the same quantity-by-rate calculation and sum to A$7,194.83. Every fixture line lands on an exact cent, so the native PDF subtotal equals the displayed table total.
Measurement to check: Measure the finished alcove on three sides, the wet-wall area and the drain location before selecting the base. Selection to check: Keep the shower base, screen and finish tile as named allowances until the products are selected. The PDF uses a 0% tax input only to make its fictional arithmetic visible. Confirm the GST treatment that applies to the actual job and set your own markup before sharing a client quote.
Assumptions and exclusions
Confirm water shutoff, demolition, waterproofing inspection and curing time before promising a handoff date.
Outside this stated scope: No bathroom layout change, concealed structural repair or whole-room repainting.
Rot behind the surround or a drain that cannot align with the chosen base changes the work. A changed condition should lead to a newly measured quantity, revised allowance or separately agreed task. Keep the client informed of the changed figure before producing another PDF.
Open the app-exported PDF
The document was exported from Estimates using the fictional business, client, dates, short PDF scope, notes and cost lines shown here. The image is the first-page preview. Open the complete PDF to check all entries; no rate is a current Sydney, New South Wales market claim.
Adapt this example to a real job
- Write the actual work boundary and site address; use this measurement basis: Measure the finished alcove on three sides, the wet-wall area and the drain location before selecting the base.
- Confirm products, access and handoff responsibilities; record this selection decision: Keep the shower base, screen and finish tile as named allowances until the products are selected.
- Replace all fictional product, labour and subcontractor rates with your own evidence.
- Review quantities, extensions, total, GST and markup settings, client details and validity date.
- Preview every PDF page and share the quote with the agreed exclusions.
- Measure the finished alcove on three sides, the wet-wall area and the drain location before selecting the base.
- Keep the shower base, screen and finish tile as named allowances until the products are selected.
- Confirm water shutoff, demolition, waterproofing inspection and curing time before promising a handoff date.
- Rot behind the surround or a drain that cannot align with the chosen base changes the work.
Read the paired estimating guide for the project-specific scope and work sequence.
Questions about this estimate
Which quantity controls this bath to shower conversion estimate?
Measure the finished alcove on three sides, the wet-wall area and the drain location before selecting the base.
When should this bath to shower conversion quote be revised?
Rot behind the surround or a drain that cannot align with the chosen base changes the work. No bathroom layout change, concealed structural repair or whole-room repainting.