Kitchen & bath · Manchester · GBP

Bath to shower conversion estimate example in Manchester: itemised PDF

Download a fictional UK bath to shower conversion estimate PDF with 7 itemised lines totalling £4,543.69. Check the quantities, GBP rates, scope and exclusions.

EXAMPLE AT A GLANCE

This fictional Manchester bath to shower conversion project has 7 itemised lines and an illustrative £4,543.69 total. The app-exported PDF, first-page preview, measurement basis, scope boundaries and matching UK estimating guide let you inspect every quantity and rate.

What this example covers

This fictional job is set in Manchester and concerns one existing bath alcove. Remove one bath and fit a shower in the same alcove, with a new base, wall finish, valve trim and screen allowance. Existing supply and drain positions remain. The estimate is a bounded document: the customer should be able to compare the described work with its measured lines, product allowances and exclusions. The matching UK guide explains how to prepare those inputs.

Prepared by
Cedar & Beam Builders · fictional business
Prepared for
Jordan Taylor · fictional customer
Example location
Manchester, UK
Issued / valid through
25 September 2026 / 25 October 2026

Itemised bath to shower conversion example

These 7 lines reproduce the app-exported PDF exactly. The largest is Wall finish installation at £1,446.69; this is one fictional component, not a typical price. Read each quantity with its unit: area, length, time, count and lump sum describe different work and must not be interchanged.

Bath to shower conversion in Manchester — GBP, fictional inputs
Work itemQuantityUnit rateAmount
Dust protection1 lump sum£132.00£132.00
Bath and surround removal1 lump sum£336.00£336.00
Shower tray allowance1 each£608.00£608.00
Wet-wall preparation and waterproofing7 sq m£155.00£1,085.00
Wall finish installation7 sq m£206.67£1,446.69
Valve trim and screen allowance1 set£784.00£784.00
Disposal and final seal1 lump sum£152.00£152.00
Illustrative total£4,543.69

The table separates the named product or material allowances from labour and site tasks wherever the scope needs that distinction. Before replacing a rate, check whether the product allowance includes delivery, waste, fixings and the selected specification.

How the total is calculated

Wet-wall preparation and waterproofing is 7 sq m × £155.00 = £1,085.00. Wall finish installation is 7 sq m × £206.67 = £1,446.69. The other lines follow the same calculation and sum to £4,543.69. Each fixture line lands on an exact penny, so the native PDF total equals the sum of the displayed line amounts.

Measurement to check: Measure the finished alcove on three sides, the wet-wall area and the drain location before selecting the base. Selection to check: Keep the shower tray, screen and finish tile as named allowances until the products are selected. The 0% tax field and zero markup are example document inputs, not an instruction for a live quote. Decide the correct settings for your own business and job.

Assumptions and exclusions

Confirm water shutoff, demolition, waterproofing inspection and curing time before promising a handoff date.

Outside this stated scope: No bathroom layout change, concealed structural repair or whole-room repainting.

Rot behind the surround or a drain that cannot align with the chosen base changes the work. A changed condition should lead to a newly measured quantity, explicit revised allowance or separately agreed task. Keep the customer informed of which figure changed and why before producing another PDF.

Download the app PDF

The document was exported from Estimates using the fictional business, client, dates, short PDF scope, notes and cost lines above. Its first page appears below. Download the complete PDF to inspect every entry and its presentation; no listed rate is a current Manchester market claim.

First page of the fictional bath to shower conversion estimate PDF

Make an estimate for your own job

  1. Write the actual work boundary and exclusions. Use this measurement basis: Measure the finished alcove on three sides, the wet-wall area and the drain location before selecting the base.
  2. Confirm the selected products and access conditions. Record this selection decision: Keep the shower tray, screen and finish tile as named allowances until the products are selected.
  3. Replace every fictional product, labour and subcontractor rate with your own evidence.
  4. Check line extensions, total, tax and markup settings, customer details and validity date.
  5. Preview every PDF page before sharing the estimate with the customer.
  • Measure the finished alcove on three sides, the wet-wall area and the drain location before selecting the base.
  • Keep the shower tray, screen and finish tile as named allowances until the products are selected.
  • Confirm water shutoff, demolition, waterproofing inspection and curing time before promising a handoff date.
  • Rot behind the surround or a drain that cannot align with the chosen base changes the work.

Read the matching estimating guide for the project-specific measurement and work sequence.

Questions about this job

Which quantity controls this bath to shower conversion estimate?

Measure the finished alcove on three sides, the wet-wall area and the drain location before selecting the base.

When should this bath to shower conversion quote be revised?

Rot behind the surround or a drain that cannot align with the chosen base changes the work. No bathroom layout change, concealed structural repair or whole-room repainting.

MAKE THE EXAMPLE YOUR OWN

Build a bath to shower conversion estimate

Use Estimates on iPhone or Android to enter your measured scope and line items. Review the result carefully and export a PDF for the actual job.

Plain-text version · Browse all samples

Less paperwork. More time for the job.

Make your next estimate on iPhone or Android, then review it before sharing.

Download on the App StoreGet it on Google Play