EXAMPLE AT A GLANCE
A bathtub to shower conversion example for one existing bath alcove contains 7 itemized lines totaling $5,665.00 before tax or markup. The actual app PDF, measurement basis, project boundaries and a matching how-to guide are available here; every rate is fictional.
What this example covers
Remove one bathtub and fit a shower in the same alcove, with a new base, wall finish, valve trim and screen allowance. Existing supply and drain positions remain.
Use this example to see a complete document for one existing bath alcove. The brief is tied to Portland, Oregon for a plausible project setting; the amounts are fictional input values and do not represent local market prices. The estimating guide explains the decisions behind these lines.
- Prepared by
- Cedar & Beam Builders Β· fictional business
- Prepared for
- Jordan Taylor Β· fictional customer
- Example project
- One existing bath alcove
- Issued / valid through
- September 25, 2026 / October 25, 2026
Itemized bathtub to shower conversion example
These are the same quantities and unit prices used by the downloadable app PDF. A cost line can represent measured work, a selected product allowance or a distinct site task. Check which interpretation applies before replacing any amount.
| Work item | Quantity | Unit price | Amount |
|---|---|---|---|
| Dust protection | 1 job | $165.00 | $165.00 |
| Tub and surround removal | 1 job | $420.00 | $420.00 |
| Shower base allowance | 1 each | $760.00 | $760.00 |
| Wet-wall preparation and waterproofing | 75 sq. ft. | $18.00 | $1,350.00 |
| Wall finish installation | 75 sq. ft. | $24.00 | $1,800.00 |
| Valve trim and screen allowance | 1 set | $980.00 | $980.00 |
| Disposal and final seal | 1 job | $190.00 | $190.00 |
| Subtotal / example total | $5,665.00 | ||
How the subtotal is calculated
The example line for wet-wall preparation and waterproofing is 75 sq. ft. Γ $18.00 = $1,350.00. This line is one part of the complete 7-item estimate and uses a fictional unit rate.
The document sums the rounded line amounts to $5,665.00. Tax and markup are not included; a zero tax field in a sample document does not mean a real project is tax-exempt. Confirm the actual treatment for the job you are quoting.
Measurement to verify: Measure the finished alcove on three sides, the wet-wall area and the drain location before selecting the base. Selection to verify: Keep the shower base, screen and finish tile as named allowances until the products are selected.
Assumptions and exclusions
Confirm water shutoff, demolition, waterproofing inspection and curing time before promising a handoff date.
Outside the stated scope: No bathroom layout change, concealed structural repair or whole-room repainting.
Rot behind the surround or a drain that cannot align with the chosen base changes the work. If the scope changes after a client reviews the estimate, update the relevant quantities, allowances and written exclusions before sharing a revised PDF.
Download the actual app PDF
The downloadable document was exported from Estimates using the fictional business, client, scope and cost lines shown above. The preview is its first page. Review the full PDF before using its layout or wording as a reference for your own estimate.
Build your own version
- Write the actual job boundary and measured quantities. Measurement basis to check: Measure the finished alcove on three sides, the wet-wall area and the drain location before selecting the base.
- Confirm products, access and handoff responsibilities. Selection decision to record: Keep the shower base, screen and finish tile as named allowances until the products are selected.
- Replace every fictional rate with your own supplier, labor and subcontractor inputs.
- Add business and client details, set the appropriate tax and markup, then preview all PDF pages.
- Share the estimate with its exclusions and a clear validity date.
- Measure the finished alcove on three sides, the wet-wall area and the drain location before selecting the base.
- Keep the shower base, screen and finish tile as named allowances until the products are selected.
- Confirm water shutoff, demolition, waterproofing inspection and curing time before promising a handoff date.
- Rot behind the surround or a drain that cannot align with the chosen base changes the work.
Questions about this estimate
Which quantity controls this bathtub to shower conversion estimate?
Measure the finished alcove on three sides, the wet-wall area and the drain location before selecting the base.
When should this bathtub to shower conversion quote be revised?
Rot behind the surround or a drain that cannot align with the chosen base changes the work. No bathroom layout change, concealed structural repair or whole-room repainting.
TURN THIS EXAMPLE INTO YOUR OWN ESTIMATE
Build a bathtub to shower conversion estimate for your project
Use Estimates on iPhone or Android to draft a scope with AI assistance or enter each line yourself. Review quantities, rates, exclusions, and client details before exporting a PDF. The example is free to inspect; some app features may require an in-app purchase.