Heat recovery ventilation installation estimate example in Oxford: itemised PDF

Download a fictional UK heat recovery ventilation installation estimate PDF with 7 itemised lines totalling £9,143.28. Check the quantities, GBP rates, scope and exclusions.

EXAMPLE AT A GLANCE

This fictional Oxford heat recovery ventilation installation project has 7 itemised lines and an illustrative £9,143.28 total. The app-exported PDF, first-page preview, measurement basis, scope boundaries and matching UK estimating guide let you inspect every quantity and rate.

What this example covers

This fictional job is set in Oxford and concerns one small dwelling ventilation unit. Install a selected heat-recovery ventilation unit with defined supply and extract points in an accessible area, subject to system design. The estimate is a bounded document: the customer should be able to compare the described work with its measured lines, product allowances and exclusions. The matching UK guide explains how to prepare those inputs.

Prepared by
Cedar & Beam Builders · fictional business
Prepared for
Jordan Taylor · fictional customer
Example location
Oxford, UK
Issued / valid through
25 September 2026 / 25 October 2026

Itemised heat recovery ventilation installation example

These 7 lines reproduce the app-exported PDF exactly. The largest is Duct and insulation allowance at £2,591.28; this is one fictional component, not a typical price. Read each quantity with its unit: area, length, time, count and lump sum describe different work and must not be interchanged.

Heat recovery ventilation installation in Oxford — GBP, fictional inputs
Work itemQuantityUnit rateAmount
Ventilation design allowance1 lump sum£520.00£520.00
HRV unit allowance1 each£2,080.00£2,080.00
Duct and insulation allowance54.9 metres£47.20£2,591.28
Supply and extract terminals6 each£108.00£648.00
Duct installation labour30 hours£76.00£2,280.00
Power and control allowance1 lump sum£576.00£576.00
Airflow balance and handoff1 lump sum£448.00£448.00
Illustrative total£9,143.28

The table separates the named product or material allowances from labour and site tasks wherever the scope needs that distinction. Before replacing a rate, check whether the product allowance includes delivery, waste, fixings and the selected specification.

How the total is calculated

Duct and insulation allowance is 54.9 metres × £47.20 = £2,591.28. Supply and extract terminals is 6 each × £108.00 = £648.00. The other lines follow the same calculation and sum to £9,143.28. Each fixture line lands on an exact penny, so the native PDF total equals the sum of the displayed line amounts.

Measurement to check: Count terminals, measure duct routes and available plant space, and record condensate and power needs. Selection to check: Separate unit, duct, terminals and controls from commissioning. The 0% tax field and zero markup are example document inputs, not an instruction for a live quote. Decide the correct settings for your own business and job.

Assumptions and exclusions

Confirm airflow design and duct routes before cutting openings.

Outside this stated scope: No whole-house retrofit, structural openings or unreviewed regulatory certification.

Concealed route conflicts or inadequate plant space change layout and labour. A changed condition should lead to a newly measured quantity, explicit revised allowance or separately agreed task. Keep the customer informed of which figure changed and why before producing another PDF.

Download the app PDF

The document was exported from Estimates using the fictional business, client, dates, short PDF scope, notes and cost lines above. Its first page appears below. Download the complete PDF to inspect every entry and its presentation; no listed rate is a current Oxford market claim.

First page of the fictional heat recovery ventilation installation estimate PDF

Make an estimate for your own job

  1. Write the actual work boundary and exclusions. Use this measurement basis: Count terminals, measure duct routes and available plant space, and record condensate and power needs.
  2. Confirm the selected products and access conditions. Record this selection decision: Separate unit, duct, terminals and controls from commissioning.
  3. Replace every fictional product, labour and subcontractor rate with your own evidence.
  4. Check line extensions, total, tax and markup settings, customer details and validity date.
  5. Preview every PDF page before sharing the estimate with the customer.
  • Count terminals, measure duct routes and available plant space, and record condensate and power needs.
  • Separate unit, duct, terminals and controls from commissioning.
  • Confirm airflow design and duct routes before cutting openings.
  • Concealed route conflicts or inadequate plant space change layout and labour.

Read the matching estimating guide for the project-specific measurement and work sequence.

Questions about this job

Which quantity controls this heat recovery ventilation installation estimate?

Count terminals, measure duct routes and available plant space, and record condensate and power needs.

When should this heat recovery ventilation installation quote be revised?

Concealed route conflicts or inadequate plant space change layout and labour. No whole-house retrofit, structural openings or unreviewed regulatory certification.

MAKE THE EXAMPLE YOUR OWN

Build a heat recovery ventilation installation estimate

Use Estimates on iPhone or Android to enter your measured scope and line items. Review the result carefully and export a PDF for the actual job.