Kitchen & bath Β· Denver, Colorado Β· USD

Shower base replacement labor and materials estimate example

Download an app-generated shower base replacement estimate PDF for one existing shower footprint. Review 7 itemized lines, a $2,085.00 fictional subtotal and clear exclusions.

EXAMPLE AT A GLANCE

A shower base replacement example for one existing shower footprint contains 7 itemized lines totaling $2,085.00 before tax or markup. The actual app PDF, measurement basis, project boundaries and a matching how-to guide are available here; every rate is fictional.

What this example covers

Remove a leaking shower base and install a selected new base in the existing enclosure footprint, reconnecting to a suitable drain. Retain sound wall finishes where possible.

Use this example to see a complete document for one existing shower footprint. The brief is tied to Denver, Colorado for a plausible project setting; the amounts are fictional input values and do not represent local market prices. The estimating guide explains the decisions behind these lines.

Prepared by
Cedar & Beam Builders Β· fictional business
Prepared for
Jordan Taylor Β· fictional customer
Example project
One existing shower footprint
Issued / valid through
September 25, 2026 / October 25, 2026

Itemized shower base replacement example

These are the same quantities and unit prices used by the downloadable app PDF. A cost line can represent measured work, a selected product allowance or a distinct site task. Check which interpretation applies before replacing any amount.

Shower base replacement example β€” USD
Work itemQuantityUnit priceAmount
Protection and enclosure removal1 job$180.00$180.00
Old base removal1 each$250.00$250.00
New base allowance1 each$680.00$680.00
Waste connection allowance1 set$140.00$140.00
Base fitting labor1 each$430.00$430.00
Perimeter waterproofing and seal1 job$260.00$260.00
Cleanup and disposal1 job$145.00$145.00
Subtotal / example total$2,085.00

How the subtotal is calculated

The example line for protection and enclosure removal is 1 job Γ— $180.00 = $180.00. This line is one part of the complete 7-item estimate and uses a fictional unit rate.

The document sums the rounded line amounts to $2,085.00. Tax and markup are not included; a zero tax field in a sample document does not mean a real project is tax-exempt. Confirm the actual treatment for the job you are quoting.

Measurement to verify: Measure the finished opening, threshold, drain offset and surround overlap before ordering a base. Selection to verify: Identify the base, waste assembly and any wall-repair allowance separately.

Assumptions and exclusions

Sequence enclosure removal, base inspection, waterproofing and reinstatement so each trade knows the handoff.

Outside the stated scope: No full shower wall rebuild, structural floor repair or fixture relocation.

Wet subfloor or incompatible drain geometry is a change trigger after removal. If the scope changes after a client reviews the estimate, update the relevant quantities, allowances and written exclusions before sharing a revised PDF.

Download the actual app PDF

The downloadable document was exported from Estimates using the fictional business, client, scope and cost lines shown above. The preview is its first page. Review the full PDF before using its layout or wording as a reference for your own estimate.

First page of the fictional shower base replacement estimate PDF

Build your own version

  1. Write the actual job boundary and measured quantities. Measurement basis to check: Measure the finished opening, threshold, drain offset and surround overlap before ordering a base.
  2. Confirm products, access and handoff responsibilities. Selection decision to record: Identify the base, waste assembly and any wall-repair allowance separately.
  3. Replace every fictional rate with your own supplier, labor and subcontractor inputs.
  4. Add business and client details, set the appropriate tax and markup, then preview all PDF pages.
  5. Share the estimate with its exclusions and a clear validity date.
  • Measure the finished opening, threshold, drain offset and surround overlap before ordering a base.
  • Identify the base, waste assembly and any wall-repair allowance separately.
  • Sequence enclosure removal, base inspection, waterproofing and reinstatement so each trade knows the handoff.
  • Wet subfloor or incompatible drain geometry is a change trigger after removal.

Questions about this estimate

Which quantity controls this shower base replacement estimate?

Measure the finished opening, threshold, drain offset and surround overlap before ordering a base.

When should this shower base replacement quote be revised?

Wet subfloor or incompatible drain geometry is a change trigger after removal. No full shower wall rebuild, structural floor repair or fixture relocation.

TURN THIS EXAMPLE INTO YOUR OWN ESTIMATE

Build a shower base replacement estimate for your project

Use Estimates on iPhone or Android to draft a scope with AI assistance or enter each line yourself. Review quantities, rates, exclusions, and client details before exporting a PDF. The example is free to inspect; some app features may require an in-app purchase.

Plain-text version Β· Browse all samples