EXAMPLE AT A GLANCE
This fictional Wollongong, New South Wales commercial amenities room refresh example contains 7 itemised costs totalling A$9,507.65. Its app-exported PDF uses the exact metric quantities and AUD rates in the table, with scope assumptions and exclusions explained below.
Project scope: One small shared amenities room
Refresh one small commercial amenities room in the existing layout with selected fixtures, floor finish and wall painting, retaining suitable services.
This original fictional example is set in Wollongong, New South Wales. Harbour & Gum Projects and Alex Morgan are made-up parties. The matching Australian guide explains which measurements, product decisions and site conditions turn this brief into a client-ready quote.
- Example location
- Wollongong, New South Wales
- Prepared by
- Harbour & Gum Projects · fictional business
- Prepared for
- Alex Morgan · fictional customer
- Issued / valid through
- 25 September 2026 / 25 October 2026
Itemised commercial amenities room refresh costs
These 7 AUD lines reproduce the native app export. Fixture allowance is measured as 1 set; Floor finish allowance uses 10.68 m². Some lines are measured work while others are a product or site-task allowance. Read the unit before reusing the structure for a different job.
| Work item | Quantity | Unit rate | Amount |
|---|---|---|---|
| Site and shutdown planning | 1 job | A$482.40 | A$482.40 |
| Protection and strip-out | 1 job | A$924.60 | A$924.60 |
| Fixture allowance | 1 set | A$2,479.00 | A$2,479.00 |
| Fixture installation labour | 1 job | A$1,661.60 | A$1,661.60 |
| Floor finish allowance | 10.68 m² | A$158.75 | A$1,695.45 |
| Floor and wall finishing | 1 job | A$1,701.80 | A$1,701.80 |
| Waste and reopening check | 1 job | A$562.80 | A$562.80 |
| Illustrative total | A$9,507.65 | ||
Product selection and installation should be clear from the descriptions. Confirm delivery, fixings, preparation, waste and any specialist trade responsibility for the actual job rather than assuming each allowance covers them.
Check the arithmetic
Fixture allowance: 1 set × A$2,479.00 = A$2,479.00. Floor finish allowance: 10.68 m² × A$158.75 = A$1,695.45. All other lines use the same quantity-by-rate calculation and sum to A$9,507.65. Every fixture line lands on an exact cent, so the native PDF subtotal equals the displayed table total.
Measurement to check: Count fixtures and partitions, measure floor and paintable wall surfaces and confirm access restrictions. Selection to check: Keep fixture and finish allowances distinct from installation and closures. The PDF uses a 0% tax input only to make its fictional arithmetic visible. Confirm the GST treatment that applies to the actual job and set your own markup before sharing a client quote.
Assumptions and exclusions
Plan shutdown and reopening around the building operator before removal.
Outside this stated scope: No layout change, service upgrade or certified accessibility redesign.
Accessibility or service defects found during work require a revised scope. A changed condition should lead to a newly measured quantity, revised allowance or separately agreed task. Keep the client informed of the changed figure before producing another PDF.
Open the app-exported PDF
The document was exported from Estimates using the fictional business, client, dates, short PDF scope, notes and cost lines shown here. The image is the first-page preview. Open the complete PDF to check all entries; no rate is a current Wollongong, New South Wales market claim.
Adapt this example to a real job
- Write the actual work boundary and site address; use this measurement basis: Count fixtures and partitions, measure floor and paintable wall surfaces and confirm access restrictions.
- Confirm products, access and handoff responsibilities; record this selection decision: Keep fixture and finish allowances distinct from installation and closures.
- Replace all fictional product, labour and subcontractor rates with your own evidence.
- Review quantities, extensions, total, GST and markup settings, client details and validity date.
- Preview every PDF page and share the quote with the agreed exclusions.
- Count fixtures and partitions, measure floor and paintable wall surfaces and confirm access restrictions.
- Keep fixture and finish allowances distinct from installation and closures.
- Plan shutdown and reopening around the building operator before removal.
- Accessibility or service defects found during work require a revised scope.
Read the paired estimating guide for the project-specific scope and work sequence.
Questions about this estimate
Which quantity controls this commercial amenities room refresh estimate?
Count fixtures and partitions, measure floor and paintable wall surfaces and confirm access restrictions.
When should this commercial amenities room refresh quote be revised?
Accessibility or service defects found during work require a revised scope. No layout change, service upgrade or certified accessibility redesign.
TURN THE SCOPE INTO AN ITEMISED PDF
Make your own commercial amenities room refresh estimate.
Describe the actual job in Estimates on iPhone or Android or use AI assistance to start a draft. Check every measurement, quantity, rate, allowance, client detail and note before exporting your PDF. Some app features may require an in-app purchase.