Commercial & access · Regina, Saskatchewan · CAD

Commercial washroom refresh itemized cost breakdown and PDF in Canada

Inspect an app-exported commercial washroom refresh estimate for one small shared washroom in Regina, Saskatchewan. Check 7 CAD line items, a C$9,185.00 fictional total and the scope assumptions.

EXAMPLE AT A GLANCE

This fictional Regina, Saskatchewan commercial washroom refresh example contains 7 itemized costs totaling C$9,185.00 before tax or markup. The app-exported PDF uses the exact quantities and CAD rates shown in the table, with scope limits explained below.

Project scope: One small shared washroom

Refresh one small commercial washroom in the existing layout with selected fixtures, floor finish and wall painting, retaining suitable services.

The fictional project is set in Regina, Saskatchewan. Cedar & Beam Builders and Jordan Taylor are example names, not a contractor and client case study. The matching guide explains how measurement, product selection and site conditions affect the estimate.

Location
Regina, Saskatchewan
Prepared by
Cedar & Beam Builders · fictional business
Prepared for
Jordan Taylor · fictional client
Issued / valid through
September 25 / October 25, 2026

The 7 CAD cost lines

The table uses the exact items, quantities and unit rates in the app-exported PDF. Multiply each quantity by its rate to check the amount. These chosen figures demonstrate the document; they are not surveyed prices or suggested rates for Regina, Saskatchewan.

Commercial washroom refresh example · CAD
Work itemQuantityUnit rateAmount
Site and shutdown planning1 jobC$470.00C$470.00
Protection and strip-out1 jobC$895.00C$895.00
Fixture allowance1 setC$2,405.00C$2,405.00
Fixture installation labour1 jobC$1,610.00C$1,610.00
Floor finish allowance115 sq. ft.C$14.00C$1,610.00
Floor and wall finishing1 jobC$1,650.00C$1,650.00
Waste and reopening check1 jobC$545.00C$545.00
Illustrative subtotalC$9,185.00

Check the arithmetic

  • Fixture allowance: 1 set × C$2,405.00 = C$2,405.00.
  • Floor finish allowance: 115 sq. ft. × C$14.00 = C$1,610.00.

The rounded line amounts add to C$9,185.00. The PDF's tax field is 0%, so its illustrated total stays C$9,185.00 before any markup. The sample shows 0% tax only to make the arithmetic visible. Determine any applicable GST, HST or PST and markup for the actual work before sharing a quote.

Measurement to verify: Count fixtures and partitions, measure floor and paintable wall surfaces and confirm access restrictions. Product decision: Keep fixture and finish allowances distinct from installation and closures.

The floor finish allowance line uses 115 sq. ft., approximately 10.68 m². Keep the actual site measurement and the supplier’s selling unit together when you replace this quantity.

Assumptions and exclusions

Plan shutdown and reopening around the building operator before removal.

Outside this example: No layout change, service upgrade or certified accessibility redesign.

Accessibility or service defects found during work require a revised scope. Inspect the existing substrate, access and product selections at the property. Check any local trade or municipal requirements that apply and record unresolved conditions before preparing the final client document. Confirm a change and update the estimate before adding work that was not in the base scope.

Download the actual app PDF

The PDF was exported from Estimates for this fictional Canadian job. It carries a concise version of the project scope, plus the same customer, cost lines, CAD amounts and total used here. Its note covers the fictional tax setting and the brief's full exclusion sentence; the article records additional assumptions that do not fit in that PDF note.

First page of the fictional Regina, Saskatchewan commercial washroom refresh PDF estimate

Build the next estimate from your own inputs

  1. Measure the actual site and describe the work boundary in plain language.
  2. Confirm the selected products, access and handoff responsibilities with the client.
  3. Replace every fictional rate with your own labour, supplier and subcontractor figures.
  4. Check the relevant GST, HST or PST treatment and markup for the job without copying this sample's zero entry.
  5. Preview each PDF page, total and exclusion note before sharing.
  • Count fixtures and partitions, measure floor and paintable wall surfaces and confirm access restrictions.
  • Keep fixture and finish allowances distinct from installation and closures.
  • Plan shutdown and reopening around the building operator before removal.
  • Accessibility or service defects found during work require a revised scope.

Questions about this estimate

Which quantity controls this commercial washroom refresh estimate?

Count fixtures and partitions, measure floor and paintable wall surfaces and confirm access restrictions.

When should this commercial washroom refresh quote be revised?

Accessibility or service defects found during work require a revised scope. No layout change, service upgrade or certified accessibility redesign.

MAKE THE NEXT ESTIMATE YOUR OWN

Build a commercial washroom refresh estimate.

Enter the job scope in Estimates on iPhone or Android or start from an AI-assisted draft. Check every quantity, rate, allowance, client detail and note before exporting the PDF. Some app features may require an in-app purchase.

Plain-text version · Browse all samples

Make the next estimate clearer.

Your scope and your pricing, together in one PDF.

Download on the App StoreGet it on Google Play