Commercial & access · Edinburgh · GBP

Commercial washroom refresh estimate example in Edinburgh: itemised PDF

Download a fictional UK commercial washroom refresh estimate PDF with 7 itemised lines totalling £5,677.29. Check the quantities, GBP rates, scope and exclusions.

EXAMPLE AT A GLANCE

This fictional Edinburgh commercial washroom refresh project has 7 itemised lines and an illustrative £5,677.29 total. The app-exported PDF, first-page preview, measurement basis, scope boundaries and matching UK estimating guide let you inspect every quantity and rate.

What this example covers

This fictional job is set in Edinburgh and concerns one small shared washroom. Refresh one small commercial washroom in the existing layout with selected fixtures, floor finish and wall painting, retaining suitable services. The estimate is a bounded document: the customer should be able to compare the described work with its measured lines, product allowances and exclusions. The matching UK guide explains how to prepare those inputs.

Prepared by
Cedar & Beam Builders · fictional business
Prepared for
Jordan Taylor · fictional customer
Example location
Edinburgh, UK
Issued / valid through
25 September 2026 / 25 October 2026

Itemised commercial washroom refresh example

These 7 lines reproduce the app-exported PDF exactly. The largest is Fixture allowance at £1,480.00; this is one fictional component, not a typical price. Read each quantity with its unit: area, length, time, count and lump sum describe different work and must not be interchanged.

Commercial washroom refresh in Edinburgh — GBP, fictional inputs
Work itemQuantityUnit rateAmount
Site and shutdown planning1 lump sum£288.00£288.00
Protection and strip-out1 lump sum£552.00£552.00
Fixture allowance1 set£1,480.00£1,480.00
Fixture installation labour1 lump sum£992.00£992.00
Floor finish allowance10.7 sq m£94.70£1,013.29
Floor and wall finishing1 lump sum£1,016.00£1,016.00
Waste and reopening check1 lump sum£336.00£336.00
Illustrative total£5,677.29

The table separates the named product or material allowances from labour and site tasks wherever the scope needs that distinction. Before replacing a rate, check whether the product allowance includes delivery, waste, fixings and the selected specification.

How the total is calculated

Floor finish allowance is 10.7 sq m × £94.70 = £1,013.29. Protection and strip-out is 1 lump sum × £552.00 = £552.00. The other lines follow the same calculation and sum to £5,677.29. Each fixture line lands on an exact penny, so the native PDF total equals the sum of the displayed line amounts.

Measurement to check: Count fixtures and partitions, measure floor and paintable wall surfaces and confirm access restrictions. Selection to check: Keep fixture and finish allowances distinct from installation and closures. The 0% tax field and zero markup are example document inputs, not an instruction for a live quote. Decide the correct settings for your own business and job.

Assumptions and exclusions

Plan shutdown and reopening around the building operator before removal.

Outside this stated scope: No layout change, service upgrade or certified accessibility redesign.

Accessibility or service defects found during work require a revised scope. A changed condition should lead to a newly measured quantity, explicit revised allowance or separately agreed task. Keep the customer informed of which figure changed and why before producing another PDF.

Download the app PDF

The document was exported from Estimates using the fictional business, client, dates, short PDF scope, notes and cost lines above. Its first page appears below. Download the complete PDF to inspect every entry and its presentation; no listed rate is a current Edinburgh market claim.

First page of the fictional commercial washroom refresh estimate PDF

Make an estimate for your own job

  1. Write the actual work boundary and exclusions. Use this measurement basis: Count fixtures and partitions, measure floor and paintable wall surfaces and confirm access restrictions.
  2. Confirm the selected products and access conditions. Record this selection decision: Keep fixture and finish allowances distinct from installation and closures.
  3. Replace every fictional product, labour and subcontractor rate with your own evidence.
  4. Check line extensions, total, tax and markup settings, customer details and validity date.
  5. Preview every PDF page before sharing the estimate with the customer.
  • Count fixtures and partitions, measure floor and paintable wall surfaces and confirm access restrictions.
  • Keep fixture and finish allowances distinct from installation and closures.
  • Plan shutdown and reopening around the building operator before removal.
  • Accessibility or service defects found during work require a revised scope.

Read the matching estimating guide for the project-specific measurement and work sequence.

Questions about this job

Which quantity controls this commercial washroom refresh estimate?

Count fixtures and partitions, measure floor and paintable wall surfaces and confirm access restrictions.

When should this commercial washroom refresh quote be revised?

Accessibility or service defects found during work require a revised scope. No layout change, service upgrade or certified accessibility redesign.

MAKE THE EXAMPLE YOUR OWN

Build a commercial washroom refresh estimate

Use Estimates on iPhone or Android to enter your measured scope and line items. Review the result carefully and export a PDF for the actual job.

Plain-text version · Browse all samples

Less paperwork. More time for the job.

Make your next estimate on iPhone or Android, then review it before sharing.

Download on the App StoreGet it on Google Play