Painting & surfaces · UK estimating guide

Kitchen cabinet painting material and labour takeoff guide

Plan a UK kitchen cabinet painting estimate with measured scope, product choices and exclusions. Review 7 fictional GBP lines and the matching £4,380.80 PDF example.

THE ESTIMATING ANSWER

Estimate kitchen cabinet painting by measuring the defined eighteen doors and six drawers, separating product allowances from labour and setting out the work sequence and exclusions. This fictional Edinburgh example uses 7 itemised lines totalling £4,380.80; its exact quantities and rates appear in the paired app PDF.

The worked job is eighteen doors and six drawers in Edinburgh. The written scope is: Prepare and coat 18 kitchen cabinet doors and six drawer fronts, with frames finished in place. Existing boxes remain. Its matching itemised example shows how that description becomes quantities, allowances and a PDF. These figures are fictional inputs for learning the method, so check the real site, specification and supplier or subcontractor costs before quoting.

1. Define the measured job

Prepare and coat 18 kitchen cabinet doors and six drawer fronts, with frames finished in place. Existing boxes remain. Count fronts, exposed frame area and removable hardware; record the existing finish for adhesion preparation. Record the measurements and existing condition in the estimate before turning quantities into line items. The scope should make clear why this is a separate project from a broader renovation or maintenance quote.

Measure for this job: Count fronts, exposed frame area and removable hardware; record the existing finish for adhesion preparation. Record the measured basis next to the relevant cost lines, since a room count, fitted length and purchased product quantity may each use a different unit.

2. Build a product and labour schedule

Specify coating, colour, primer and whether new hardware is included as separate choices. This example has 7 distinct lines, including masking and door schedule, remove and label fronts, degrease and sand. Use actual supplier prices and labour inputs for a customer job; the displayed amounts are fictional document inputs.

Choose before pricing: Specify coating, colour, primer and whether new hardware is included as separate choices. Keep a named allowance when the selection is open, and replace it once the actual product and delivery terms are known.

3. Sequence the work and handoffs

Label each front before removal and plan off-site or staged curing before rehang. Show which task depends on access, a selected product or another trade. If that dependency is still open, label the price preliminary and identify the information needed before a firm quote.

Plan the handoffs: Label each front before removal and plan off-site or staged curing before rehang. State which stage needs access or inspection before the next can begin, especially if a concealed condition might stop the work.

4. Set a change boundary

Peeling laminate or oil contamination may require more preparation than the base allowance. The example excludes cabinet replacement, internal box painting or worktop changes. Record the discovery, agree the revised work and update the estimate before adding it to the job.

Change trigger: Peeling laminate or oil contamination may require more preparation than the base allowance. If this happens, write down the revised quantity and responsibility before adding an item to the customer estimate.

Worked project calculation

The paired PDF has 7 cost lines. For example, Remove and label fronts is 24 each × £14.40 = £345.60; Degrease and sand is 16 hours × £38.40 = £614.40. Each amount is the stated quantity multiplied by its unit rate. Recheck whether a line describes installed work, a material purchase allowance or a distinct visit before changing its quantity.

Kitchen cabinet painting example — GBP, fictional inputs
Work itemQuantityUnit rateAmount
Masking and door schedule1 lump sum£208.00£208.00
Remove and label fronts24 each£14.40£345.60
Degrease and sand16 hours£38.40£614.40
Primer and coating allowance1 lump sum£416.00£416.00
Coat doors and drawers24 each£76.00£1,824.00
Frame coating in place1 lump sum£512.00£512.00
Rehang and adjustment24 each£19.20£460.80
Illustrative total£4,380.80

Adding the 7 exact line amounts gives £4,380.80. The PDF uses a 0% tax input and no markup solely to display this arithmetic. Decide the appropriate tax, overhead and profit treatment for an actual job; the fictional rates are not local averages or price recommendations.

Scope and price boundaries

Prepare and coat 18 kitchen cabinet doors and six drawer fronts, with frames finished in place. Existing boxes remain.

Outside this example: No cabinet replacement, internal box painting or worktop changes.

The role in this brief is painter. Confirm who supplies the selected products, makes the site safe, removes waste and signs off the work. Where opening up reveals a different condition, document it and issue a revised scope and price rather than silently extending the base estimate. Also check access, drying or curing time, and the client handoff described in the work sequence.

Before you send

  • Count fronts, exposed frame area and removable hardware; record the existing finish for adhesion preparation.
  • Specify coating, colour, primer and whether new hardware is included as separate choices.
  • Label each front before removal and plan off-site or staged curing before rehang.
  • Peeling laminate or oil contamination may require more preparation than the base allowance.

Compare the written scope with every line in the kitchen cabinet painting PDF example. The preview below is the first page of the actual app export; open the PDF to inspect its full scope, notes and amounts.

First page of a fictional kitchen cabinet painting estimate PDF

Questions about this job

Which quantity controls this kitchen cabinet painting estimate?

Count fronts, exposed frame area and removable hardware; record the existing finish for adhesion preparation.

When should this kitchen cabinet painting quote be revised?

Peeling laminate or oil contamination may require more preparation than the base allowance. No cabinet replacement, internal box painting or worktop changes.

FROM SITE NOTES TO AN ITEMISED PDF

Build your own kitchen cabinet painting estimate

Enter the project boundary and your measured lines in Estimates on iPhone or Android. Edit the fictional quantities and rates, add the actual business and client details, then inspect the PDF before sharing it.

Plain-text version · Browse all guides

Less paperwork. More time for the job.

Make your next estimate on iPhone or Android, then review it before sharing.

Download on the App StoreGet it on Google Play